IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,394

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0078 # 04 Y:2004 04 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,970 $400 Implemented
UU0078 # 05 Y:2004 05 2004 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $5,620 $12,000 Not Implemented
UU0078 # 06 Y:2004 06 2004 CONTRACT A WOOD PALLET RECYCLING COMPANY $5,720 $1,120 Not Implemented
UU0078 # 07 Y:2004 07 2004 OPTIMIZE PLANT POWER FACTOR $10,400 $11,590 Not Implemented
UU0078 # 08 Y:2004 08 2004 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $810 $450 Implemented
TA0090 # 01 Y:2004 01 2004 CONDENSE OPERATION INTO ONE BUILDING $91,320 $20,000 Not Implemented
TA0090 # 02 Y:2004 02 2004 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $42,810 $64,000 Not Implemented
TA0090 # 03 Y:2004 03 2004 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $23,490 $45,000 Not Implemented
TA0090 # 04 Y:2004 04 2004 ADOPT IN-HOUSE MATERIAL GENERATION $2,350 $0 Not Implemented
TA0090 # 05 Y:2004 05 2004 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $1,920 $120 Not Implemented
TA0090 # 06 Y:2004 06 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $910 $8 Not Implemented
TA0090 # 07 Y:2004 07 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $280 $120 Implemented
UF0354 # 01 Y:2004 01 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $48,587 $63,488 Implemented
UF0354 # 02 Y:2004 02 2004 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $19,414 $0 Implemented
UF0354 # 03 Y:2004 03 2004 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $18,795 $62,620 Not Implemented
UF0354 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,169 $745 Not Implemented
UF0354 # 05 Y:2004 05 2004 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $7,962 $31,000 Implemented
UF0354 # 06 Y:2004 06 2004 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $6,140 $779 Not Implemented
UF0354 # 07 Y:2004 07 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,543 $0 Implemented
UF0354 # 08 Y:2004 08 2004 ADD AREA LIGHTING SWITCHES $2,354 $11,495 Not Implemented
UF0354 # 09 Y:2004 09 2004 RECYCLE FLUORESCENT LAMPS $2,883 $3,496 Not Implemented
AM0475 # 12 Y:2004 12 2004 INSULATE BARE EQUIPMENT $450 $60 Not Implemented
AM0475 # 11 Y:2004 11 2004 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $572 $699 Not Implemented
AM0475 # 10 Y:2004 10 2004 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,740 $425 Implemented
AM0475 # 09 Y:2004 09 2004 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $1,600 $12,500 Not Implemented