Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,002
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TT0103 # 02 Y:2012 | 02 | 2012 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $9,152 | $35,480 | Not Implemented |
TT0103 # 01 Y:2012 | 01 | 2012 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $19,502 | $0 | Implemented |
UMS013 # 01 Y:2012 | 01 | 2012 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $320,000 | $600,000 | Not Implemented |
UMS013 # 02 Y:2012 | 02 | 2012 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $106,000 | $200,000 | Not Implemented |
UMS013 # 03 Y:2012 | 03 | 2012 | USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST | $673,000 | $1,000,000 | Not Implemented |
UMS013 # 04 Y:2012 | 04 | 2012 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $465,000 | $700,000 | Not Implemented |
UMS013 # 05 Y:2012 | 05 | 2012 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $137,000 | $0 | Not Implemented |
MAS035 # 03 Y:2012 | 03 | 2012 | INSULATE BARE EQUIPMENT | $525 | $1,700 | Not Implemented |
MAS035 # 02 Y:2012 | 02 | 2012 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $1,443 | $0 | Implemented |
MAS035 # 01 Y:2012 | 01 | 2012 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $5,986 | $2,000 | Implemented |
MZ0104 # 01 Y:2012 | 01 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $34,398 | $26,000 | Implemented |
MZ0104 # 02 Y:2012 | 02 | 2012 | INSTALL OCCUPANCY SENSORS | $2,309 | $1,750 | Not Implemented |
MZ0104 # 03 Y:2012 | 03 | 2012 | TURN OFF EQUIPMENT WHEN NOT IN USE | $2,102 | $0 | Not Implemented |
MZ0104 # 04 Y:2012 | 04 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,616 | $30,000 | Implemented |
MZ0104 # 05 Y:2012 | 05 | 2012 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $3,111 | $900 | Implemented |
MZ0104 # 06 Y:2012 | 06 | 2012 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $7,299 | $1,160 | Not Implemented |
MZ0104 # 07 Y:2012 | 07 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,461 | $850 | Not Implemented |
MZ0104 # 08 Y:2012 | 08 | 2012 | USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR | $152,137 | $150,000 | Not Implemented |
MZ0104 # 09 Y:2012 | 09 | 2012 | USE FLUE GASES IN RADIANT HEATER FOR SPACE HEATING, OVENS, ETC | $13,645 | $25,000 | Not Implemented |
MZ0104 # 10 Y:2012 | 10 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $83,490 | $112,500 | Implemented |
BD0420 # 08 Y:2012 | 08 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $130 | $275 | Not Implemented |
BD0420 # 07 Y:2012 | 07 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $608 | $3,000 | Not Implemented |
BD0420 # 06 Y:2012 | 06 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $746 | $20 | Not Implemented |
BD0420 # 05 Y:2012 | 05 | 2012 | INSTALL OCCUPANCY SENSORS | $756 | $2,100 | Not Implemented |
BD0420 # 04 Y:2012 | 04 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $857 | $2,925 | Not Implemented |