Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
50,056
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0630 # 08 Y:2025 | 08 | 2025 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $1,256 | $2,120 | n/a |
UF0630 # 07 Y:2025 | 07 | 2025 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $6,407 | $25,400 | n/a |
UF0630 # 06 Y:2025 | 06 | 2025 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $9,264 | $14,760 | n/a |
UF0630 # 05 Y:2025 | 05 | 2025 | IMPROVE COMBUSTION CONTROL CAPABILITY | $10,115 | $40,000 | n/a |
UF0630 # 04 Y:2025 | 04 | 2025 | IMPROVE COMBUSTION CONTROL CAPABILITY | $10,115 | $2,000 | n/a |
UF0630 # 03 Y:2025 | 03 | 2025 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $12,224 | $8,907 | n/a |
UF0630 # 02 Y:2025 | 02 | 2025 | KEEP SOLID FUELS / RAW MATERIALS DRY | $25,034 | $48,000 | n/a |
UF0630 # 01 Y:2025 | 01 | 2025 | UPGRADE CONTROLS ON COMPRESSORS | $66,329 | $8,820 | n/a |
DL0258 # 04 Y:2025 | 04 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,565 | $200 | n/a |
DL0258 # 03 Y:2025 | 03 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,102 | $3,500 | n/a |
DL0258 # 02 Y:2025 | 02 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,808 | $25,000 | n/a |
DL0258 # 01 Y:2025 | 01 | 2025 | INSTALL OCCUPANCY SENSORS | $2,112 | $5,500 | n/a |
LS2512 # 01 Y:2025 | 01 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,432 | $1,275 | n/a |
LS2512 # 05 Y:2025 | 05 | 2025 | REPLACE BOILER | $31,301 | $286,589 | n/a |
LS2512 # 04 Y:2025 | 04 | 2025 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $27,997 | $144,549 | n/a |
LS2512 # 03 Y:2025 | 03 | 2025 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $6,381 | $25,003 | n/a |
LS2512 # 02 Y:2025 | 02 | 2025 | ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL | $16,150 | $25,000 | n/a |
MU0066 # 01 Y:2025 | 01 | 2025 | TURN OFF EQUIPMENT WHEN NOT IN USE | $226 | $0 | n/a |
MU0066 # 02 Y:2025 | 02 | 2025 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $762 | $362 | n/a |
MU0066 # 03 Y:2025 | 03 | 2025 | USE PHOTOCELL CONTROLS | $302 | $550 | n/a |
MU0066 # 04 Y:2025 | 04 | 2025 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $49,773 | $560,225 | n/a |
MU0066 # 05 Y:2025 | 05 | 2025 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $189 | $627 | n/a |
MU0066 # 06 Y:2025 | 06 | 2025 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $4,303 | $4,440 | n/a |
MU0066 # 07 Y:2025 | 07 | 2025 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $251 | $242 | n/a |
MU0066 # 08 Y:2025 | 08 | 2025 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $116 | $193 | n/a |