Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,485
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0364 # 01 Y:2019 | 01 | 2019 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $38,687 | $109,552 | Implemented |
IC0227 # 01 Y:2019 | 01 | 2019 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $3,221 | $800 | Not Implemented |
IC0227 # 02 Y:2019 | 02 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,441 | $1,500 | Not Implemented |
IC0227 # 03 Y:2019 | 03 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,117 | $7,146 | Not Implemented |
IC0227 # 04 Y:2019 | 04 | 2019 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $4,978 | $9,600 | Not Implemented |
IC0227 # 05 Y:2019 | 05 | 2019 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $7,871 | $28,000 | Not Implemented |
UK1915 # 01 Y:2019 | 01 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,711 | $2,510 | n/a |
UK1915 # 02 Y:2019 | 02 | 2019 | RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT | $7,951 | $17,032 | n/a |
UK1915 # 03 Y:2019 | 03 | 2019 | INSTALL OCCUPANCY SENSORS | $259 | $260 | n/a |
UK1915 # 04 Y:2019 | 04 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $19,983 | $21,695 | n/a |
UK1915 # 05 Y:2019 | 05 | 2019 | REPLACE TREATED WATER WITH WELL / SURFACE WATER | $53,903 | $10,200 | n/a |
UK1915 # 06 Y:2019 | 06 | 2019 | INSULATE BARE EQUIPMENT | $13,534 | $26,305 | n/a |
UK1915 # 07 Y:2019 | 07 | 2019 | OPTIMIZE PLANT POWER FACTOR | $127,719 | $54,495 | n/a |
NL0042 # 08 Y:2019 | 08 | 2019 | INSTALL OCCUPANCY SENSORS | $214 | $1,050 | Not Implemented |
NL0042 # 07 Y:2019 | 07 | 2019 | COMBINE UTILITY METERS | $565 | $1,250 | Not Implemented |
NL0042 # 06 Y:2019 | 06 | 2019 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $2,989 | $2,400 | Not Implemented |
NL0042 # 05 Y:2019 | 05 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,445 | $1,600 | Implemented |
NL0042 # 04 Y:2019 | 04 | 2019 | OPTIMIZE PLANT POWER FACTOR | $3,805 | $19,000 | Not Implemented |
NL0042 # 03 Y:2019 | 03 | 2019 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $10,000 | $800 | Not Implemented |
NL0042 # 02 Y:2019 | 02 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,309 | $10,400 | Implemented |
NL0042 # 01 Y:2019 | 01 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $18,799 | $15,889 | Not Implemented |
NC0630 # 01 Y:2019 | 01 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $19,928 | $68,859 | Implemented |
NC0630 # 02 Y:2019 | 02 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $472 | $100 | Implemented |
NC0630 # 03 Y:2019 | 03 | 2019 | INSTALL OCCUPANCY SENSORS | $1,108 | $1,892 | Implemented |
NC0630 # 04 Y:2019 | 04 | 2019 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,318 | $4,000 | Not Implemented |