IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

12,007

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0611 # 03 Y:2021 03 2021 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $5,824 $24,300 Not Implemented
SD0611 # 04 Y:2021 04 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,424 $1,815 Not Implemented
SD0611 # 05 Y:2021 05 2021 INSTALL OCCUPANCY SENSORS $203 $387 Implemented
SD0611 # 06 Y:2021 06 2021 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $45,722 $186,400 Implemented
SD0611 # 07 Y:2021 07 2021 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $2,308 $6,000 Implemented
SD0610 # 01 Y:2021 01 2021 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $10,223 $1,000 Not Implemented
SD0610 # 02 Y:2021 02 2021 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $4,425 $14,300 Implemented
SD0610 # 03 Y:2021 03 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,043 $3,772 Implemented
SD0610 # 04 Y:2021 04 2021 UPGRADE OBSOLETE EQUIPMENT $343 $0 Not Implemented
SF0571 # 01 Y:2021 01 2021 TURN OFF EQUIPMENT WHEN NOT IN USE $21,900 $0 Not Implemented
SF0571 # 02 Y:2021 02 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,676 $0 Implemented
SF0571 # 03 Y:2021 03 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $98 $62 Not Implemented
SF0571 # 04 Y:2021 04 2021 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $8,159 $6,120 Not Implemented
SF0571 # 05 Y:2021 05 2021 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,182 $2,146 Implemented
SF0571 # 06 Y:2021 06 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $52,069 $64,391 Implemented
SF0571 # 07 Y:2021 07 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,241 $10,932 Implemented
SF0570 # 01 Y:2021 01 2021 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $24,674 $0 Implemented
SF0570 # 02 Y:2021 02 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $27,893 $0 Implemented
SF0570 # 03 Y:2021 03 2021 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $149,399 $10,195 Implemented
SF0570 # 04 Y:2021 04 2021 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $71,549 $5,641 Implemented
SF0570 # 05 Y:2021 05 2021 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $106,544 $31,500 Not Implemented
SF0570 # 06 Y:2021 06 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $514 $190 Not Implemented
SF0570 # 07 Y:2021 07 2021 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $39,174 $48,150 Not Implemented
SF0570 # 08 Y:2021 08 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,387 $6,315 Implemented
SF0570 # 09 Y:2021 09 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $291 $648 Implemented