Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,599
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0848 # 06 Y:2008 | 06 | 2008 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,164 | $10,000 | Not Implemented |
GT0847 # 01 Y:2008 | 01 | 2008 | USE BUILDING MATERIALS WHICH REQUIRE LESS ENERGY TO PRODUCE | $153,731 | $0 | Not Implemented |
GT0847 # 02 Y:2008 | 02 | 2008 | REUSE SCRAP GLASS AS FEED STOCK | $729,921 | $850,000 | Implemented |
GT0847 # 03 Y:2008 | 03 | 2008 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $798,070 | $1,116,000 | Not Implemented |
GT0847 # 04 Y:2008 | 04 | 2008 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $788,500 | $514,500 | Not Implemented |
GT0847 # 05 Y:2008 | 05 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $40,596 | $8,400 | Not Implemented |
GT0847 # 06 Y:2008 | 06 | 2008 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $22,551 | $68,143 | Not Implemented |
GT0846 # 01 Y:2008 | 01 | 2008 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $61,777 | $40,000 | Implemented |
GT0846 # 02 Y:2008 | 02 | 2008 | USE MINIMUM STEAM OPERATING PRESSURE | $16,146 | $15,536 | Implemented |
GT0846 # 03 Y:2008 | 03 | 2008 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $830 | $1,094 | Not Implemented |
GT0846 # 04 Y:2008 | 04 | 2008 | USE STEAM CONDENSATE FOR HOT WATER SUPPLY (NON-POTABLE) | $17,989 | $26,900 | Not Implemented |
GT0846 # 05 Y:2008 | 05 | 2008 | HEAT WATER WITH EXHAUST HEAT | $551,313 | $130,000 | Not Implemented |
GT0846 # 06 Y:2008 | 06 | 2008 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $59,040 | $65,000 | Implemented |
GT0846 # 07 Y:2008 | 07 | 2008 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $155,720 | $30,000 | Implemented |
GT0846 # 08 Y:2008 | 08 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $24,504 | $70,103 | Implemented |
GT0846 # 09 Y:2008 | 09 | 2008 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $18,206 | $35,000 | Not Implemented |
GT0845 # 01 Y:2007 | 01 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $17,571 | $31,022 | Not Implemented |
GT0845 # 02 Y:2007 | 02 | 2007 | COMBINE UTILITY METERS | $6,697 | $0 | Not Implemented |
GT0845 # 03 Y:2007 | 03 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,196 | $0 | Not Implemented |
GT0845 # 04 Y:2007 | 04 | 2007 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $22,129 | $26,550 | Not Implemented |
GT0845 # 05 Y:2007 | 05 | 2007 | INSTALL TIMERS AND/OR THERMOSTATS | $8,290 | $4,750 | Implemented |
GT0845 # 06 Y:2007 | 06 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $24,215 | $2,000 | Implemented |
GT0845 # 07 Y:2007 | 07 | 2007 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $3,956 | $4,000 | Not Implemented |
GT0845 # 08 Y:2007 | 08 | 2007 | INSTALL OCCUPANCY SENSORS | $3,215 | $3,600 | Not Implemented |
GT0844 # 01 Y:2007 | 01 | 2007 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $19,992 | $28,800 | Not Implemented |