IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,942

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0555 # 06 Y:2018 06 2018 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $2,455 $1,000 Implemented
WV0555 # 07 Y:2018 07 2018 ADD AREA LIGHTING SWITCHES $2,327 $4,400 Not Implemented
WV0555 # 08 Y:2018 08 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,289 $3,732 Implemented
WV0555 # 09 Y:2018 09 2018 DEVELOP A REPAIR/REPLACE POLICY $507 $638 Not Implemented
UD0978 # 01 Y:2017 01 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $7,058 $0 Not Implemented
UD0978 # 02 Y:2017 02 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,107 $1,000 Not Implemented
UD0978 # 03 Y:2017 03 2017 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $1,562 $1,000 Not Implemented
UD0978 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $79,415 $79,850 Not Implemented
UD0978 # 05 Y:2017 05 2017 ADD AREA LIGHTING SWITCHES $2,220 $180 Not Implemented
UD0978 # 06 Y:2017 06 2017 USE OPTIMUM THICKNESS INSULATION $86,982 $91,480 Not Implemented
UD0978 # 07 Y:2017 07 2017 MINIMIZE NON-ESSENTIAL MATERIAL IN HEAT TREATMENT PROCESS $37,937 $100,000 Not Implemented
UD0978 # 08 Y:2017 08 2017 COVER OPEN TANKS $7,466 $5,000 Not Implemented
UD0978 # 09 Y:2017 09 2017 ADJUST BURNERS FOR EFFICIENT OPERATION $562 $0 Not Implemented
UD0976 # 01 Y:2017 01 2017 OPTIMIZE PLANT POWER FACTOR $2,704 $1,000 Not Implemented
UD0976 # 02 Y:2017 02 2017 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $11,604 $10,000 Not Implemented
UD0976 # 03 Y:2017 03 2017 REDUCE VENTILATION AIR $2,584 $3,000 Not Implemented
UD0976 # 04 Y:2017 04 2017 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $471 $0 Not Implemented
UD0976 # 05 Y:2017 05 2017 UPGRADE CONTROLS ON COMPRESSORS $8,352 $21,000 Not Implemented
UD0976 # 06 Y:2017 06 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,239 $30 Not Implemented
UD0976 # 07 Y:2017 07 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,559 $2,000 Not Implemented
UD0976 # 08 Y:2017 08 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $10,903 $1,500 Not Implemented
UD0976 # 09 Y:2017 09 2017 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $3,345 $10,950 Not Implemented
UD0976 # 10 Y:2017 10 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,649 $0 Not Implemented
UD0976 # 11 Y:2017 11 2017 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,012 $0 Not Implemented
UD0976 # 12 Y:2017 12 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,115 $31,736 Not Implemented