IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,602

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0787 # 05 Y:2019 05 2019 OPTIMIZE PLANT POWER FACTOR $70,814 $178,864 Implemented
AM0787 # 06 Y:2019 06 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,322 $825 Implemented
AM0787 # 07 Y:2019 07 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,577 $2,640 Implemented
AM0787 # 08 Y:2019 08 2019 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $399 $280 Not Implemented
TR0017 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,965 $24,824 Implemented
TR0017 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,159 $11,905 Implemented
TR0017 # 03 Y:2019 03 2019 COVER CONTAINERS TO MINIMIZE EVAPORATIVE LOSSES $382,131 $836,063 Not Implemented
TR0017 # 04 Y:2019 04 2019 REDUCE HEAT GAIN BY WINDOW TINTING $2,324 $2,142 Not Implemented
TR0017 # 05 Y:2019 05 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $631 $0 Implemented
TR0017 # 06 Y:2019 06 2019 INSTALL WIND POWERED ELECTRIC GENERATOR $134,851 $831,480 Not Implemented
TR0017 # 07 Y:2019 07 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,296 $270 Not Implemented
TR0015 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,893 $2,389 Not Implemented
TR0015 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,060 $1,959 Not Implemented
TR0015 # 03 Y:2019 03 2019 INSTALL OCCUPANCY SENSORS $1,234 $616 Not Implemented
TR0015 # 04 Y:2019 04 2019 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,095 $3,250 Implemented
TR0015 # 05 Y:2019 05 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,388 $0 Implemented
TR0015 # 06 Y:2019 06 2019 MAINTAIN MACHINES TO REDUCE LEAKS $1,094 $844 Implemented
TR0015 # 07 Y:2019 07 2019 COVER CONTAINERS TO MINIMIZE EVAPORATIVE LOSSES $483,876 $1,077,133 Not Implemented
TR0015 # 08 Y:2019 08 2019 REDUCE HEAT GAIN BY WINDOW TINTING $520 $483 Not Implemented
AM0786 # 01 Y:2019 01 2019 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $55,800 $67,044 Implemented
AM0786 # 02 Y:2019 02 2019 OPTIMIZE PLANT POWER FACTOR $11,700 $15,300 Implemented
AM0786 # 03 Y:2019 03 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,750 $22,600 Implemented
AM0786 # 04 Y:2019 04 2019 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $2,760 $4,570 Implemented
AM0786 # 05 Y:2019 05 2019 USE SYNTHETIC LUBRICANT $910 $290 Implemented
AM0785 # 01 Y:2019 01 2019 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $19,800 $750 Not Implemented