IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,582

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0057 # 07 Y:2004 07 2004 INSTALL TURBULATORS $1,680 $1,747 Not Implemented
UU0057 # 08 Y:2004 08 2004 INSTALL / REPAIR INSULATION ON STEAM LINES $1,320 $809 Not Implemented
UU0057 # 09 Y:2004 09 2004 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,920 $0 Implemented
UU0057 # 10 Y:2004 10 2004 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $398 $20 Implemented
UU0057 # 11 Y:2004 11 2004 USE REVERSE OSMOSIS TO CONCENTRATE MATERIAL $25,500 $192,450 Not Implemented
UU0054 # 01 Y:2003 01 2003 RECOVER WASTE HEAT FROM EQUIPMENT $170 $698 n/a
UU0054 # 02 Y:2003 02 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $185 $130 n/a
UU0054 # 03 Y:2003 03 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,707 $0 n/a
UU0054 # 04 Y:2003 04 2003 OPTIMIZE PLANT POWER FACTOR $1,487 $720 n/a
UU0054 # 05 Y:2003 05 2003 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,909 $3,500 n/a
UU0054 # 06 Y:2003 06 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $868 $10,415 n/a
UU0054 # 07 Y:2003 07 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,752 $0 n/a
UU0053 # 01 Y:2003 01 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,354 $4,100 Not Implemented
UU0053 # 02 Y:2003 02 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $11,131 $55 Not Implemented
UU0053 # 03 Y:2003 03 2003 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,710 $2,000 Not Implemented
UU0053 # 04 Y:2003 04 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,112 $70,635 Not Implemented
UU0053 # 05 Y:2003 05 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,869 $2,340 Implemented
UU0053 # 06 Y:2003 06 2003 INSTALL TURBULATORS $2,610 $1,572 Not Implemented
UU0052 # 01 Y:2003 01 2003 OPTIMIZE PLANT POWER FACTOR $12,731 $22,600 n/a
UU0052 # 02 Y:2003 02 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,035 $134 n/a
UU0052 # 03 Y:2003 03 2003 RECOVER WASTE HEAT FROM EQUIPMENT $3,186 $2,810 n/a
UU0052 # 04 Y:2003 04 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,302 $1,661 n/a
UU0052 # 05 Y:2003 05 2003 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,027 $6,000 n/a
UU0052 # 06 Y:2003 06 2003 INSTALL SPECTRAL REFLECTORS / DELAMP $2,237 $410 n/a
UU0052 # 07 Y:2003 07 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $392 $594 n/a