IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,500

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0241 # 13 Y:2002 13 2002 CLEAR AND RENT EXISTING SPACE $5,850 $220 Implemented
WV0241 # 14 Y:2002 14 2002 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $5,000 $280 Not Implemented
NC0213 # 01 Y:2001 01 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $272 $450 Not Implemented
NC0213 # 02 Y:2001 02 2001 AVOID REWINDING MOTORS MORE THAN TWICE $8,087 $6,437 Implemented
NC0213 # 03 Y:2001 03 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,084 $1,559 Not Implemented
NC0213 # 04 Y:2001 04 2001 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $44,656 $40,000 Not Implemented
NC0213 # 05 Y:2001 05 2001 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $13,013 $35,000 Implemented
NC0213 # 06 Y:2001 06 2001 INSULATE BARE EQUIPMENT $9,104 $17,000 Not Implemented
NC0213 # 07 Y:2001 07 2001 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $90,560 $35,000 Implemented
OD0174 # 01 Y:2000 01 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,705 $2,700 Not Implemented
OD0174 # 02 Y:2000 02 2000 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $864 $1,000 Not Implemented
OD0174 # 03 Y:2000 03 2000 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,307 $2,000 Not Implemented
OD0174 # 04 Y:2000 04 2000 METER WASTE WATER $4,925 $2,156 Not Implemented
OD0175 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $27,794 $49,324 Not Implemented
OD0175 # 02 Y:2000 02 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $800 $520 Implemented
OD0173 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,398 $2,860 n/a
OD0173 # 02 Y:2000 02 2000 USE SYNTHETIC LUBRICANT $1,068 $442 n/a
OD0173 # 03 Y:2000 03 2000 REDUCE VENTILATION AIR $634 $252 n/a
OD0171 # 01 Y:2000 01 2000 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $22,439 $93,700 Not Implemented
OD0171 # 02 Y:2000 02 2000 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $567 $0 Not Implemented
OD0170 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,359 $5,892 Implemented
OD0170 # 02 Y:2000 02 2000 INSTALL TIMERS AND/OR THERMOSTATS $1,337 $115 Not Implemented
OD0170 # 03 Y:2000 03 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $642 $726 Implemented
OD0170 # 04 Y:2000 04 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $795 $1,000 Not Implemented
OD0166 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,013 $8,525 n/a