IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,640

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0193 # 06 Y:2001 06 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,368 $2,660 Implemented
BD0193 # 07 Y:2001 07 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,352 $1,000 Implemented
BD0193 # 08 Y:2001 08 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $324 $350 Implemented
BD0193 # 09 Y:2001 09 2001 CONVERT TO ELECTROSTATIC POWDER COATING $42,843 $150,000 n/a
BD0193 # 10 Y:2001 10 2001 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $2,710 $7,000 Not Implemented
BD0193 # 11 Y:2001 11 2001 CONTRACT A WOOD PALLET RECYCLING COMPANY $700 $180 Not Implemented
BD0193 # 12 Y:2001 12 2001 REUSE / RECYCLE/ SELL PAPER PRODUCTS $663 $500 Not Implemented
BD0193 # 13 Y:2001 13 2001 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $62,772 $5,000 Implemented
SU0121 # 01 Y:2001 01 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $5,756 $450 Not Implemented
SU0121 # 02 Y:2001 02 2001 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $508 $945 Implemented
SU0121 # 03 Y:2001 03 2001 INSULATE BARE EQUIPMENT $1,001 $69 Implemented
SU0121 # 04 Y:2001 04 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,452 $0 Implemented
SU0121 # 05 Y:2001 05 2001 CONTRACT A WOOD PALLET RECYCLING COMPANY $1,638 $271 Not Implemented
SU0121 # 06 Y:2001 06 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $508 $230 Implemented
UM0195 # 01 Y:2001 01 2001 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $4,400 $3,150 Not Implemented
UM0195 # 02 Y:2001 02 2001 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $329 $500 Implemented
UM0195 # 03 Y:2001 03 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $755 $1,000 Not Implemented
UM0195 # 04 Y:2001 04 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,182 $375 Implemented
UM0195 # 05 Y:2001 05 2001 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $551 $500 Not Implemented
UM0195 # 06 Y:2001 06 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $262 $1,052 Not Implemented
WI0405 # 01 Y:2001 01 2001 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $5,787 $4,500 Implemented
WI0405 # 02 Y:2001 02 2001 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,749 $2,000 Implemented
WI0405 # 03 Y:2001 03 2001 USE EVAPORATION TO CONCENTRATE MATERIAL $3,585 $11,000 Not Implemented
WI0405 # 04 Y:2001 04 2001 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $2,138 $0 Implemented
WI0405 # 05 Y:2001 05 2001 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,216 $500 Implemented