IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,708

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0521 # 01 Y:2002 01 2002 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $27,097 $34,000 Implemented
MA0521 # 02 Y:2002 02 2002 ADJUST BURNERS FOR EFFICIENT OPERATION $16,316 $4,800 Implemented
MA0521 # 03 Y:2002 03 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,066 $7,675 Implemented
MA0521 # 04 Y:2002 04 2002 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $2,717 $360 Implemented
MA0521 # 05 Y:2002 05 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $311 $1,000 Not Implemented
IA0298 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,312 $50 Implemented
IA0298 # 02 Y:2002 02 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,060 $100 Not Implemented
IA0298 # 03 Y:2002 03 2002 INSTALL OCCUPANCY SENSORS $3,302 $2,062 Implemented
IA0298 # 04 Y:2002 04 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,683 $0 Implemented
IA0298 # 05 Y:2002 05 2002 ADJUST BURNERS FOR EFFICIENT OPERATION $5,435 $850 Implemented
IA0298 # 06 Y:2002 06 2002 DIRECT WARMEST AIR TO COMBUSTION INTAKE $4,535 $1,525 Not Implemented
IA0298 # 07 Y:2002 07 2002 INSTALL AUTOMATIC PACKING EQUIPMENT $128,016 $125,000 Not Implemented
UU0027 # 01 Y:2002 01 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,326 $9,484 Not Implemented
UU0027 # 02 Y:2002 02 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,774 $180 Implemented
UU0027 # 03 Y:2002 03 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $631 $442 Not Implemented
UU0027 # 04 Y:2002 04 2002 OPTIMIZE PLANT POWER FACTOR $6,600 $4,500 Implemented
UU0027 # 05 Y:2002 05 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,770 $12,000 Not Implemented
WV0250 # 01 Y:2002 01 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $718 $230 Not Implemented
WV0250 # 02 Y:2002 02 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,500 $0 Implemented
WV0250 # 03 Y:2002 03 2002 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,399 $1,000 Implemented
WV0250 # 04 Y:2002 04 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $765 $30 Implemented
WV0250 # 05 Y:2002 05 2002 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $4,266 $300 Implemented
WV0250 # 06 Y:2002 06 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $150 $0 Implemented
WV0250 # 07 Y:2002 07 2002 INSULATE BARE EQUIPMENT $1,387 $188 Implemented
WV0250 # 08 Y:2002 08 2002 REPLACE BOILER $65,563 $100,000 Not Implemented