IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,260

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0255 # 05 Y:2007 05 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,293 $1,300 Implemented
SU0255 # 06 Y:2007 06 2007 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $8,489 $4,993 Not Implemented
SU0255 # 07 Y:2007 07 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $331 $237 Not Implemented
SU0255 # 08 Y:2007 08 2007 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $14,202 $19,571 Not Implemented
SU0255 # 09 Y:2007 09 2007 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $4,084 $5,590 Not Implemented
SU0255 # 10 Y:2007 10 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,025 $32,224 Not Implemented
SU0255 # 11 Y:2007 11 2007 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $269 $727 Not Implemented
SU0255 # 12 Y:2007 12 2007 OPTIMIZE PLANT POWER FACTOR $563 $3,344 Not Implemented
MI0156 # 01 Y:2007 01 2007 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $7,785 $1,800 Not Implemented
MI0156 # 02 Y:2007 02 2007 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $6,674 $1,232 Implemented
MI0156 # 03 Y:2007 03 2007 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $4,301 $2,121 Not Implemented
MI0156 # 04 Y:2007 04 2007 INSTALL SKYLIGHTS $2,655 $5,612 Not Implemented
MI0156 # 05 Y:2007 05 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,688 $1,074 Implemented
MI0156 # 06 Y:2007 06 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,033 $30 Implemented
MI0156 # 07 Y:2007 07 2007 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $676 $2,170 Not Implemented
IA0411 # 01 Y:2007 01 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,897 $28,132 Implemented
IA0411 # 02 Y:2007 02 2007 INSTALL OCCUPANCY SENSORS $419 $1,309 Not Implemented
IA0411 # 03 Y:2007 03 2007 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $618 $1,000 Not Implemented
IA0411 # 04 Y:2007 04 2007 USE MINIMUM STEAM OPERATING PRESSURE $833 $150 Not Implemented
IA0411 # 05 Y:2007 05 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $911 $1,275 Not Implemented
IA0411 # 06 Y:2007 06 2007 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $17,816 $1,375 Not Implemented
IA0411 # 07 Y:2007 07 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $441 $410 Not Implemented
IA0411 # 08 Y:2007 08 2007 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,675 $33 Implemented
MI0155 # 01 Y:2007 01 2007 UTILIZE A LESS EXPENSIVE COOLING METHOD $66,401 $120,000 Not Implemented
MI0155 # 02 Y:2007 02 2007 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $51,399 $22,558 Not Implemented