IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,485

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0227 # 01 Y:2019 01 2019 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $73,127 $4,450 Not Implemented
TT0227 # 02 Y:2019 02 2019 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,143 $2,500 Not Implemented
TT0227 # 03 Y:2019 03 2019 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $4,828 $5,000 Implemented
TT0227 # 04 Y:2019 04 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,227 $2,000 Implemented
TT0227 # 05 Y:2019 05 2019 UPGRADE CONTROLS ON COMPRESSORS $2,646 $2,000 Implemented
TT0227 # 06 Y:2019 06 2019 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,110 $550 Not Implemented
TT0227 # 07 Y:2019 07 2019 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $399 $750 Not Implemented
AS0477 # 01 Y:2019 01 2019 ADOPT IN-HOUSE MATERIAL GENERATION $718,945 $688,982 Not Implemented
AS0477 # 02 Y:2019 02 2019 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $64,747 $120,000 Implemented
AS0477 # 03 Y:2019 03 2019 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $17,100 $7,907 Implemented
AS0477 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,264 $3,590 Implemented
AS0477 # 05 Y:2019 05 2019 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,125 $1,213 Implemented
GT0930 # 01 Y:2019 01 2019 INSTALL OCCUPANCY SENSORS $11,220 $2,763 Implemented
GT0930 # 02 Y:2019 02 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,062 $3,500 Implemented
GT0930 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,531 $8,066 Implemented
GT0930 # 04 Y:2019 04 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $479 $463 Implemented
GT0930 # 05 Y:2019 05 2019 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,746 $1,755 Implemented
GT0930 # 06 Y:2019 06 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,093 $2,092 Not Implemented
GT0930 # 07 Y:2019 07 2019 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,081 $2,100 Implemented
GT0930 # 08 Y:2019 08 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,041 $3,500 Implemented
GT0930 # 09 Y:2019 09 2019 USE SOLAR HEAT TO MAKE ELECTRICTY $37,647 $154,353 Not Implemented
NL0038 # 01 Y:2019 01 2019 USE DEMAND CONTROLLER OR LOAD SHEDDER $16,358 $20,000 Not Implemented
NL0038 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,352 $25,229 Not Implemented
NL0038 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,806 $4,500 Not Implemented
NL0038 # 04 Y:2019 04 2019 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $4,391 $31,162 Not Implemented