Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,317
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0359 # 05 Y:2007 | 05 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,306 | $18,395 | Implemented |
WV0359 # 06 Y:2007 | 06 | 2007 | DEVELOP A REPAIR/REPLACE POLICY | $5,087 | $1,973 | Implemented |
WV0359 # 07 Y:2007 | 07 | 2007 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,874 | $300 | Implemented |
WV0359 # 08 Y:2007 | 08 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,840 | $2,123 | Implemented |
WV0359 # 09 Y:2007 | 09 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,391 | $0 | Implemented |
WV0359 # 10 Y:2007 | 10 | 2007 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,313 | $850 | Implemented |
WV0359 # 11 Y:2007 | 11 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $538 | $131 | Implemented |
WV0358 # 01 Y:2007 | 01 | 2007 | IMPROVE COMBUSTION CONTROL CAPABILITY | $91,739 | $34,400 | Not Implemented |
WV0358 # 02 Y:2007 | 02 | 2007 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $27,409 | $34,100 | Not Implemented |
WV0358 # 03 Y:2007 | 03 | 2007 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $20,287 | $6,050 | Implemented |
WV0358 # 04 Y:2007 | 04 | 2007 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $24,675 | $15,300 | Implemented |
WV0358 # 05 Y:2007 | 05 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,775 | $8,600 | Implemented |
WV0358 # 06 Y:2007 | 06 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,908 | $5,830 | Not Implemented |
WV0358 # 07 Y:2007 | 07 | 2007 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $1,651 | $1,000 | Implemented |
WV0358 # 08 Y:2007 | 08 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,029 | $0 | Implemented |
WV0358 # 09 Y:2007 | 09 | 2007 | DEVELOP A REPAIR/REPLACE POLICY | $1,016 | $555 | Implemented |
WV0358 # 10 Y:2007 | 10 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $998 | $1,555 | Implemented |
WV0358 # 11 Y:2007 | 11 | 2007 | INSTALL OCCUPANCY SENSORS | $679 | $2,103 | Implemented |
WV0358 # 12 Y:2007 | 12 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $468 | $78 | Implemented |
WV0358 # 13 Y:2007 | 13 | 2007 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $432 | $119 | Not Implemented |
WV0358 # 14 Y:2007 | 14 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $410 | $22 | Not Implemented |
WV0354 # 01 Y:2007 | 01 | 2007 | USE RADIANT HEATER FOR SPOT HEATING | $46,761 | $33,200 | Not Implemented |
WV0354 # 02 Y:2007 | 02 | 2007 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $15,205 | $2,100 | Not Implemented |
WV0354 # 03 Y:2007 | 03 | 2007 | RECOVER WASTE HEAT FROM EQUIPMENT | $14,128 | $900 | Implemented |
WV0354 # 04 Y:2007 | 04 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,520 | $15,381 | Not Implemented |