IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,317

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0359 # 05 Y:2007 05 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,306 $18,395 Implemented
WV0359 # 06 Y:2007 06 2007 DEVELOP A REPAIR/REPLACE POLICY $5,087 $1,973 Implemented
WV0359 # 07 Y:2007 07 2007 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,874 $300 Implemented
WV0359 # 08 Y:2007 08 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,840 $2,123 Implemented
WV0359 # 09 Y:2007 09 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,391 $0 Implemented
WV0359 # 10 Y:2007 10 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,313 $850 Implemented
WV0359 # 11 Y:2007 11 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $538 $131 Implemented
WV0358 # 01 Y:2007 01 2007 IMPROVE COMBUSTION CONTROL CAPABILITY $91,739 $34,400 Not Implemented
WV0358 # 02 Y:2007 02 2007 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $27,409 $34,100 Not Implemented
WV0358 # 03 Y:2007 03 2007 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $20,287 $6,050 Implemented
WV0358 # 04 Y:2007 04 2007 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $24,675 $15,300 Implemented
WV0358 # 05 Y:2007 05 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,775 $8,600 Implemented
WV0358 # 06 Y:2007 06 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,908 $5,830 Not Implemented
WV0358 # 07 Y:2007 07 2007 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $1,651 $1,000 Implemented
WV0358 # 08 Y:2007 08 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,029 $0 Implemented
WV0358 # 09 Y:2007 09 2007 DEVELOP A REPAIR/REPLACE POLICY $1,016 $555 Implemented
WV0358 # 10 Y:2007 10 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $998 $1,555 Implemented
WV0358 # 11 Y:2007 11 2007 INSTALL OCCUPANCY SENSORS $679 $2,103 Implemented
WV0358 # 12 Y:2007 12 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $468 $78 Implemented
WV0358 # 13 Y:2007 13 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $432 $119 Not Implemented
WV0358 # 14 Y:2007 14 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $410 $22 Not Implemented
WV0354 # 01 Y:2007 01 2007 USE RADIANT HEATER FOR SPOT HEATING $46,761 $33,200 Not Implemented
WV0354 # 02 Y:2007 02 2007 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $15,205 $2,100 Not Implemented
WV0354 # 03 Y:2007 03 2007 RECOVER WASTE HEAT FROM EQUIPMENT $14,128 $900 Implemented
WV0354 # 04 Y:2007 04 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,520 $15,381 Not Implemented