IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,520

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0356 # 01 Y:1999 01 1999 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $24,660 $0 Not Implemented
AM0356 # 02 Y:1999 02 1999 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $12,500 $0 Not Implemented
AM0356 # 03 Y:1999 03 1999 CONTRACT A WOOD PALLET RECYCLING COMPANY $8,260 $0 Not Implemented
AM0356 # 04 Y:1999 04 1999 OPTIMIZE PLANT POWER FACTOR $5,710 $18,100 Implemented
AM0356 # 05 Y:1999 05 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,570 $1,500 Implemented
AM0356 # 06 Y:1999 06 1999 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $2,790 $5,000 Not Implemented
AM0356 # 07 Y:1999 07 1999 USE PHOTOCELL CONTROLS $1,960 $150 Implemented
AM0356 # 08 Y:1999 08 1999 OPTIMIZE PLANT POWER FACTOR $1,950 $5,500 Implemented
AM0356 # 09 Y:1999 09 1999 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $730 $0 Not Implemented
AM0356 # 10 Y:1999 10 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $365 $940 Implemented
HO0212 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,162 $9,938 Not Implemented
HO0212 # 02 Y:1999 02 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,715 $400 Implemented
HO0212 # 03 Y:1999 03 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $10,284 $7,500 Not Implemented
HO0212 # 04 Y:1999 04 1999 INSULATE BARE EQUIPMENT $2,104 $6,840 Not Implemented
HO0212 # 05 Y:1999 05 1999 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,419 $1,467 Not Implemented
HO0212 # 06 Y:1999 06 1999 INSTALL / REPAIR INSULATION ON STEAM LINES $1,548 $2,882 Implemented
HO0212 # 07 Y:1999 07 1999 CHANGE OPERATING CONDITIONS $8,954 $20,000 Not Implemented
HO0212 # 08 Y:1999 08 1999 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $11,437 $2,882 Implemented
HO0212 # 09 Y:1999 09 1999 MOVE PRODUCT USING MECHANICAL MEANS $4,590 $12,000 Not Implemented
HO0212 # 10 Y:1999 10 1999 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $6,379 $500 Implemented
CO0448 # 01 Y:1999 01 1999 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,820 $4,000 n/a
CO0448 # 02 Y:1999 02 1999 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $830 $1,080 n/a
CO0448 # 03 Y:1999 03 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $430 $30 n/a
CO0448 # 04 Y:1999 04 1999 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $380 $150 n/a
CO0448 # 05 Y:1999 05 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $330 $210 n/a