IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,708

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0250 # 09 Y:2002 09 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,056 $3,735 Not Implemented
WV0250 # 10 Y:2002 10 2002 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $900 $665 Not Implemented
WV0250 # 11 Y:2002 11 2002 CHANGE OPERATING CONDITIONS $21,375 $875 Not Implemented
WV0250 # 12 Y:2002 12 2002 INSTALL SENSORS TO DETECT DEFECTS $11,505 $13,600 Not Implemented
TA0037 # 03 Y:2002 03 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,040 $400 Implemented
TA0037 # 04 Y:2002 04 2002 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $2,600 $0 Implemented
TA0037 # 05 Y:2002 05 2002 USE SYNTHETIC LUBRICANT $1,920 $0 Implemented
TA0037 # 06 Y:2002 06 2002 CONTRACT A WOOD PALLET RECYCLING COMPANY $1,740 $0 Implemented
TA0037 # 07 Y:2002 07 2002 DISCONNECT BALLASTS $1,360 $120 Not Implemented
TA0037 # 08 Y:2002 08 2002 PAY UTILITY BILLS ON TIME $1,220 $0 Implemented
TA0037 # 09 Y:2002 09 2002 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $580 $0 Not Implemented
UD0654 # 01 Y:2002 01 2002 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $12,000 $12,000 Not Implemented
UD0654 # 02 Y:2002 02 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,416 $5,925 Not Implemented
UD0654 # 03 Y:2002 03 2002 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $1,152 $2,800 Not Implemented
UD0654 # 04 Y:2002 04 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,212 $0 Implemented
UD0654 # 05 Y:2002 05 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $415 $200 Implemented
UM0222 # 01 Y:2002 01 2002 LIMIT AND CONTROL SECONDARY COMBUSTION AIR IN FURNACE $28,900 $10,000 Implemented
UM0222 # 02 Y:2002 02 2002 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $23,074 $1,750 Implemented
UM0222 # 03 Y:2002 03 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,900 $1,275 Implemented
UM0222 # 04 Y:2002 04 2002 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $2,523 $2,000 Not Implemented
UM0222 # 05 Y:2002 05 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,261 $4,000 Not Implemented
TA0037 # 01 Y:2002 01 2002 USE REVERSE OSMOSIS TO CONCENTRATE MATERIAL $10,025 $0 Implemented
TA0037 # 02 Y:2002 02 2002 COMBINE UTILITY METERS $7,040 $13,000 Not Implemented
NC0234 # 01 Y:2002 01 2002 USE EVAPORATION TO CONCENTRATE MATERIAL $47,833 $90,000 n/a
NC0234 # 02 Y:2002 02 2002 ADJUST BURNERS FOR EFFICIENT OPERATION $744 $800 Implemented