Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,737
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TR0027 # 02 Y:2020 | 02 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,123 | $1,562 | Implemented |
TR0027 # 03 Y:2020 | 03 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,856 | $4,480 | Implemented |
TR0027 # 04 Y:2020 | 04 | 2020 | INSTALL OCCUPANCY SENSORS | $44 | $60 | Implemented |
UA0226 # 01 Y:2020 | 01 | 2020 | BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT | $219,577 | $400 | Not Implemented |
UA0226 # 02 Y:2020 | 02 | 2020 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $15,587 | $42,000 | Not Implemented |
UA0226 # 03 Y:2020 | 03 | 2020 | MODIFY STARTUP/SHUTDOWN TIMES | $15,732 | $150 | Not Implemented |
UA0226 # 04 Y:2020 | 04 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,733 | $50 | Implemented |
UA0226 # 05 Y:2020 | 05 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,464 | $2,170 | Implemented |
UA0226 # 06 Y:2020 | 06 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,164 | $309 | Implemented |
BS0138 # 01 Y:2020 | 01 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $32,016 | $73,500 | Not Implemented |
BS0138 # 02 Y:2020 | 02 | 2020 | INSTALL OCCUPANCY SENSORS | $1,344 | $270 | Not Implemented |
BS0138 # 03 Y:2020 | 03 | 2020 | INSULATE BARE EQUIPMENT | $11,555 | $51,920 | Not Implemented |
MZ0293 # 01 Y:2020 | 01 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,827 | $320 | Implemented |
MZ0293 # 02 Y:2020 | 02 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,246 | $6,782 | Implemented |
MZ0293 # 03 Y:2020 | 03 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,924 | $910 | Implemented |
MZ0293 # 04 Y:2020 | 04 | 2020 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,596 | $4,100 | Not Implemented |
MZ0293 # 05 Y:2020 | 05 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $63,762 | $88,053 | Implemented |
MZ0293 # 06 Y:2020 | 06 | 2020 | INSTALL OCCUPANCY SENSORS | $230 | $780 | Implemented |
MZ0293 # 07 Y:2020 | 07 | 2020 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $7,010 | $25,500 | Not Implemented |
MZ0293 # 08 Y:2020 | 08 | 2020 | OPTIMIZE PLANT POWER FACTOR | $328,879 | $538,653 | Implemented |
MZ0293 # 09 Y:2020 | 09 | 2020 | RECOVER WASTE HEAT FROM EQUIPMENT | $11,186 | $28,360 | Not Implemented |
UF0551 # 01 Y:2020 | 01 | 2020 | Install Anaerobic Digester | $1,032,365 | $4,965,000 | Implemented |
UF0551 # 02 Y:2020 | 02 | 2020 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $537,853 | $1,400,000 | Implemented |
UF0551 # 03 Y:2020 | 03 | 2020 | RECOVER WASTE HEAT FROM EQUIPMENT | $62,520 | $30,000 | Implemented |
UF0551 # 04 Y:2020 | 04 | 2020 | INSTALL TURBULATORS | $18,151 | $7,500 | Not Implemented |