Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,314
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0370 # 03 Y:2004 | 03 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $15,336 | $12,650 | Not Implemented |
AS0370 # 04 Y:2004 | 04 | 2004 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $10,545 | $16,000 | Not Implemented |
AS0370 # 05 Y:2004 | 05 | 2004 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,794 | $1,844 | Not Implemented |
AS0370 # 06 Y:2004 | 06 | 2004 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $1,372 | $5,500 | Not Implemented |
AS0369 # 01 Y:2004 | 01 | 2004 | BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT | $33,626 | $16,440 | Not Implemented |
AS0369 # 02 Y:2004 | 02 | 2004 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $1,848 | $10,300 | Not Implemented |
AS0369 # 03 Y:2004 | 03 | 2004 | USE SOLAR HEAT TO HEAT WATER | $1,305 | $1,740 | Not Implemented |
AS0369 # 04 Y:2004 | 04 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $988 | $0 | Not Implemented |
AS0369 # 05 Y:2004 | 05 | 2004 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $749 | $3,500 | Implemented |
AS0369 # 06 Y:2004 | 06 | 2004 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $219 | $79 | Not Implemented |
AS0369 # 07 Y:2004 | 07 | 2004 | INSULATE BARE EQUIPMENT | $155 | $240 | Implemented |
AS0368 # 01 Y:2004 | 01 | 2004 | INSTALL EFFICIENT RECTIFIERS | $79,520 | $51,660 | Not Implemented |
AS0368 # 02 Y:2004 | 02 | 2004 | RESCHEDULE BREAKS TO ALLOW FOR CONTINUOUS PRODUCTION | $66,870 | $4,565 | Not Implemented |
AS0368 # 03 Y:2004 | 03 | 2004 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $7,943 | $52,000 | Not Implemented |
AS0368 # 04 Y:2004 | 04 | 2004 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $4,650 | $2,800 | Not Implemented |
AS0368 # 05 Y:2004 | 05 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,789 | $5,720 | Not Implemented |
AS0368 # 06 Y:2004 | 06 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,743 | $15 | Not Implemented |
AS0368 # 07 Y:2004 | 07 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,286 | $7,980 | Not Implemented |
AS0368 # 08 Y:2004 | 08 | 2004 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $192 | $199 | Not Implemented |
AS0367 # 01 Y:2004 | 01 | 2004 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $14,811 | $5,240 | Implemented |
AS0367 # 02 Y:2004 | 02 | 2004 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $36,297 | $90,000 | Not Implemented |
AS0367 # 03 Y:2004 | 03 | 2004 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $3,275 | $4,395 | Not Implemented |
AS0367 # 04 Y:2004 | 04 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,352 | $9,037 | Not Implemented |
AS0367 # 05 Y:2004 | 05 | 2004 | INSTALL SKYLIGHTS | $708 | $3,395 | Not Implemented |
AS0367 # 06 Y:2004 | 06 | 2004 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $567 | $1,500 | Not Implemented |