IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

12,007

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0607 # 06 Y:2021 06 2021 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $794 $760 Not Implemented
SD0607 # 07 Y:2021 07 2021 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $481 $706 Not Implemented
SD0607 # 08 Y:2021 08 2021 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $487 $540 Not Implemented
SF0568 # 01 Y:2021 01 2021 TURN OFF EQUIPMENT WHEN NOT IN USE $40,609 $0 Not Implemented
SF0568 # 02 Y:2021 02 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $12,914 $0 Implemented
SF0568 # 03 Y:2021 03 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,183 $400 Not Implemented
SF0568 # 04 Y:2021 04 2021 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,048 $860 Implemented
SF0568 # 05 Y:2021 05 2021 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $26,520 $43,936 Not Implemented
SF0568 # 06 Y:2021 06 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $41,828 $70,690 Implemented
SF0567 # 01 Y:2021 01 2021 TURN OFF EQUIPMENT WHEN NOT IN USE $20,821 $0 Not Implemented
SF0567 # 02 Y:2021 02 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,911 $0 Implemented
SF0567 # 03 Y:2021 03 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $9,406 $3,350 Implemented
SF0567 # 04 Y:2021 04 2021 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $24,340 $29,296 Not Implemented
SF0567 # 05 Y:2021 05 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,660 $40,195 Implemented
SF0567 # 06 Y:2021 06 2021 REUSE / RECYCLE/ SELL PAPER PRODUCTS $3,900 $0 Not Implemented
SD0606 # 04 Y:2021 04 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,222 $4,345 Not Implemented
SD0606 # 05 Y:2021 05 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $539 $0 Implemented
SD0606 # 01 Y:2021 01 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $52,049 $46,262 Not Implemented
SD0606 # 02 Y:2021 02 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,424 $3,341 Not Implemented
SD0606 # 03 Y:2021 03 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,375 $300 Implemented
SF0566 # 01 Y:2021 01 2021 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $8,567 $0 Not Implemented
SF0566 # 02 Y:2021 02 2021 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $72,559 $11,960 Not Implemented
SF0566 # 03 Y:2021 03 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $126,207 $44,180 Not Implemented
SF0566 # 04 Y:2021 04 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,474 $38,541 Not Implemented
SF0566 # 05 Y:2021 05 2021 Install Anaerobic Digester $189,018 $1,222,260 Not Implemented