IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,315

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0294 # 08 Y:2002 08 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,670 $0 Implemented
IA0294 # 09 Y:2002 09 2002 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,312 $1,500 Implemented
IA0294 # 10 Y:2002 10 2002 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,212 $1,500 Implemented
IA0294 # 11 Y:2002 11 2002 DIRECT WARMEST AIR TO COMBUSTION INTAKE $1,752 $500 Implemented
IA0294 # 12 Y:2002 12 2002 INSTALL / REPAIR INSULATION ON STEAM LINES $843 $326 Implemented
IA0293 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,150 $1,034 Implemented
IA0293 # 02 Y:2002 02 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,893 $224 Implemented
IA0293 # 03 Y:2002 03 2002 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,458 $46 Not Implemented
IA0293 # 04 Y:2002 04 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,332 $0 Not Implemented
IA0293 # 05 Y:2002 05 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,111 $6,493 Not Implemented
IA0293 # 06 Y:2002 06 2002 INSTALL OCCUPANCY SENSORS $261 $333 Implemented
IA0293 # 07 Y:2002 07 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,134 $0 Implemented
IA0293 # 08 Y:2002 08 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,769 $41 Not Implemented
IA0292 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,757 $1,256 Implemented
IA0292 # 02 Y:2002 02 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,700 $264 Implemented
IA0292 # 03 Y:2002 03 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,277 $688 Not Implemented
IA0292 # 04 Y:2002 04 2002 INSTALL OCCUPANCY SENSORS $347 $509 Not Implemented
IA0292 # 05 Y:2002 05 2002 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $133,875 $21,450 Not Implemented
IA0292 # 06 Y:2002 06 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $18,372 $5,765 Not Implemented
LL0138 # 01 Y:2002 01 2002 OPTIMIZE PLANT POWER FACTOR $115,474 $103,740 Implemented
LL0138 # 02 Y:2002 02 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $79,740 $6,360 Implemented
LL0138 # 03 Y:2002 03 2002 INSULATE BARE EQUIPMENT $10,164 $6,559 Implemented
LL0138 # 04 Y:2002 04 2002 INSULATE BARE EQUIPMENT $9,316 $6,559 Implemented
LL0138 # 05 Y:2002 05 2002 INSULATE BARE EQUIPMENT $6,985 $3,684 Implemented
LL0138 # 06 Y:2002 06 2002 INSULATE BARE EQUIPMENT $4,080 $3,684 Implemented