IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,193

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0381 # 07 Y:2011 07 2011 RECOVER WASTE HEAT FROM EQUIPMENT $2,850 $1,100 Not Implemented
UM0381 # 08 Y:2011 08 2011 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,426 $3,926 Not Implemented
UM0381 # 09 Y:2011 09 2011 INSULATE BARE EQUIPMENT $1,350 $783 Not Implemented
UM0381 # 10 Y:2011 10 2011 INSTALL / REPAIR INSULATION ON STEAM LINES $629 $220 Implemented
UM0380 # 01 Y:2010 01 2010 INSTALL OCCUPANCY SENSORS $2,880 $2,484 Not Implemented
UM0380 # 02 Y:2010 02 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $861 $3,000 Not Implemented
UM0380 # 03 Y:2010 03 2010 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $30,357 $350,000 Not Implemented
UM0380 # 04 Y:2010 04 2010 USE DIRECT FLAME IMPINGEMENT OR INFRARED PROCESSING FOR CHAMBER TYPE HEATING $21,456 $250,000 Not Implemented
UM0380 # 05 Y:2010 05 2010 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $6,024 $14,751 Not Implemented
UM0380 # 06 Y:2010 06 2010 USE HEAT PUMP FOR SPACE CONDITIONING $7,702 $217,800 Not Implemented
UM0380 # 07 Y:2010 07 2010 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $3,245 $5,500 Not Implemented
UM0380 # 08 Y:2010 08 2010 RECOVER WASTE HEAT FROM EQUIPMENT $1,714 $1,500 Not Implemented
UM0380 # 09 Y:2010 09 2010 PREHEAT COMBUSTION AIR WITH WASTE HEAT $273 $1,400 Not Implemented
UM0377 # 01 Y:2010 01 2010 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $4,826 $600,000 Not Implemented
UM0377 # 02 Y:2010 02 2010 UPGRADE CONTROLS ON COMPRESSORS $4,594 $7,127 Not Implemented
UM0377 # 03 Y:2010 03 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $421 $200 Not Implemented
UM0377 # 04 Y:2010 04 2010 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $71 $10 Not Implemented
UM0377 # 05 Y:2010 05 2010 USE STEAM CONDENSATE FOR HOT WATER SUPPLY (NON-POTABLE) $47,701 $4,568 Not Implemented
UM0377 # 06 Y:2010 06 2010 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $11,037 $8,500 Not Implemented
UM0377 # 07 Y:2010 07 2010 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $14,767 $700 Not Implemented
UM0377 # 08 Y:2010 08 2010 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $2,554 $11,607 Not Implemented
UM0377 # 09 Y:2010 09 2010 REPROCESS SPENT OILS ON SITE FOR RE-USE $626 $627 Not Implemented
UM0376 # 01 Y:2010 01 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,368 $36,732 Implemented
UM0376 # 02 Y:2010 02 2010 INSTALL OCCUPANCY SENSORS $7,625 $250 Implemented
UM0376 # 03 Y:2010 03 2010 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,381 $9,416 Implemented