Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,193
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0381 # 07 Y:2011 | 07 | 2011 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,850 | $1,100 | Not Implemented |
UM0381 # 08 Y:2011 | 08 | 2011 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $1,426 | $3,926 | Not Implemented |
UM0381 # 09 Y:2011 | 09 | 2011 | INSULATE BARE EQUIPMENT | $1,350 | $783 | Not Implemented |
UM0381 # 10 Y:2011 | 10 | 2011 | INSTALL / REPAIR INSULATION ON STEAM LINES | $629 | $220 | Implemented |
UM0380 # 01 Y:2010 | 01 | 2010 | INSTALL OCCUPANCY SENSORS | $2,880 | $2,484 | Not Implemented |
UM0380 # 02 Y:2010 | 02 | 2010 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $861 | $3,000 | Not Implemented |
UM0380 # 03 Y:2010 | 03 | 2010 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $30,357 | $350,000 | Not Implemented |
UM0380 # 04 Y:2010 | 04 | 2010 | USE DIRECT FLAME IMPINGEMENT OR INFRARED PROCESSING FOR CHAMBER TYPE HEATING | $21,456 | $250,000 | Not Implemented |
UM0380 # 05 Y:2010 | 05 | 2010 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $6,024 | $14,751 | Not Implemented |
UM0380 # 06 Y:2010 | 06 | 2010 | USE HEAT PUMP FOR SPACE CONDITIONING | $7,702 | $217,800 | Not Implemented |
UM0380 # 07 Y:2010 | 07 | 2010 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $3,245 | $5,500 | Not Implemented |
UM0380 # 08 Y:2010 | 08 | 2010 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,714 | $1,500 | Not Implemented |
UM0380 # 09 Y:2010 | 09 | 2010 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $273 | $1,400 | Not Implemented |
UM0377 # 01 Y:2010 | 01 | 2010 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $4,826 | $600,000 | Not Implemented |
UM0377 # 02 Y:2010 | 02 | 2010 | UPGRADE CONTROLS ON COMPRESSORS | $4,594 | $7,127 | Not Implemented |
UM0377 # 03 Y:2010 | 03 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $421 | $200 | Not Implemented |
UM0377 # 04 Y:2010 | 04 | 2010 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $71 | $10 | Not Implemented |
UM0377 # 05 Y:2010 | 05 | 2010 | USE STEAM CONDENSATE FOR HOT WATER SUPPLY (NON-POTABLE) | $47,701 | $4,568 | Not Implemented |
UM0377 # 06 Y:2010 | 06 | 2010 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $11,037 | $8,500 | Not Implemented |
UM0377 # 07 Y:2010 | 07 | 2010 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $14,767 | $700 | Not Implemented |
UM0377 # 08 Y:2010 | 08 | 2010 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $2,554 | $11,607 | Not Implemented |
UM0377 # 09 Y:2010 | 09 | 2010 | REPROCESS SPENT OILS ON SITE FOR RE-USE | $626 | $627 | Not Implemented |
UM0376 # 01 Y:2010 | 01 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $24,368 | $36,732 | Implemented |
UM0376 # 02 Y:2010 | 02 | 2010 | INSTALL OCCUPANCY SENSORS | $7,625 | $250 | Implemented |
UM0376 # 03 Y:2010 | 03 | 2010 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $4,381 | $9,416 | Implemented |