Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,599
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0507 # 08 Y:2006 | 08 | 2006 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $32,400 | $23,200 | Not Implemented |
OR0507 # 09 Y:2006 | 09 | 2006 | INSTALL OCCUPANCY SENSORS | $2,100 | $2,100 | Not Implemented |
OR0507 # 10 Y:2006 | 10 | 2006 | INSTALL ISOLATION TRANSFORMER ON ADJUSTABLE FREQUENCY DRIVE | $22,760 | $24,900 | Implemented |
OR0507 # 11 Y:2006 | 11 | 2006 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $1,800 | $2,600 | Not Implemented |
OR0507 # 12 Y:2006 | 12 | 2006 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $61,100 | $85 | Not Implemented |
OR0507 # 13 Y:2006 | 13 | 2006 | OPTIMIZE PLANT POWER FACTOR | $6,600 | $10,500 | Not Implemented |
OR0507 # 14 Y:2006 | 14 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,300 | $5 | Not Implemented |
OR0507 # 15 Y:2006 | 15 | 2006 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $4,890 | $19,200 | Implemented |
OR0507 # 16 Y:2006 | 16 | 2006 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $77,400 | $330,000 | Not Implemented |
OR0504 # 01 Y:2006 | 01 | 2006 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $64,300 | $20,000 | Implemented |
OR0504 # 02 Y:2006 | 02 | 2006 | REPLACE STEAM JETS ON VACUUM SYSTEM WITH ELECTRIC MOTOR DRIVEN VACUUM PUMPS | $22,500 | $44,500 | Implemented |
OR0504 # 03 Y:2006 | 03 | 2006 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $84,100 | $0 | Not Implemented |
OR0504 # 04 Y:2006 | 04 | 2006 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $28,000 | $0 | Not Implemented |
OR0504 # 05 Y:2006 | 05 | 2006 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $23,000 | $0 | Implemented |
OR0504 # 06 Y:2006 | 06 | 2006 | REDESIGN PROCESS | $6,100 | $5,000 | Not Implemented |
OR0504 # 07 Y:2006 | 07 | 2006 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $2,500 | $1,000 | Not Implemented |
OR0506 # 01 Y:2006 | 01 | 2006 | ADD ADDITIONAL PRODUCTION SHIFT | $360,000 | $2,100 | Implemented |
OR0506 # 02 Y:2006 | 02 | 2006 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $9,000 | $2,100 | Implemented |
OR0506 # 03 Y:2006 | 03 | 2006 | TURN OFF EQUIPMENT WHEN NOT IN USE | $6,000 | $0 | Implemented |
OR0506 # 04 Y:2006 | 04 | 2006 | ADD ADDITIONAL PRODUCTION SHIFT | $11,400 | $2,700 | Implemented |
OR0506 # 05 Y:2006 | 05 | 2006 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $1,200 | $3,600 | Implemented |
OR0506 # 06 Y:2006 | 06 | 2006 | PAY BILLS ON TIME TO AVOID LATE FEES | $2,300 | $0 | Implemented |
OR0503 # 01 Y:2006 | 01 | 2006 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $37,500 | $42,500 | Implemented |
OR0503 # 02 Y:2006 | 02 | 2006 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $23,480 | $24,300 | Not Implemented |
OR0503 # 03 Y:2006 | 03 | 2006 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $17,800 | $36,000 | Implemented |