IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,767

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0115 # 05 Y:2013 05 2013 REPLACE ELECTRIC MOTORS WITH BACK PRESSURE STEAM TURBINES AND USE EXHAUST STEAM FOR PROCESS HEAT $146,360 $450,000 Not Implemented
TT0115 # 06 Y:2013 06 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,000 $4,000 Not Implemented
TT0115 # 07 Y:2013 07 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,635 $2,500 Not Implemented
TT0115 # 08 Y:2013 08 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $16,984 $20,000 Not Implemented
TT0115 # 09 Y:2013 09 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,635 $20,000 Not Implemented
TT0114 # 01 Y:2013 01 2013 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $7,820 $0 Implemented
TT0114 # 02 Y:2013 02 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $42 $0 Implemented
TT0114 # 03 Y:2013 03 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $13,529 $125 Implemented
TT0114 # 04 Y:2013 04 2013 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $6,310 $9,125 Not Implemented
TT0114 # 05 Y:2013 05 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $360 $315 Implemented
TT0114 # 06 Y:2013 06 2013 INSTALL OCCUPANCY SENSORS $6,033 $5,950 Implemented
TT0114 # 07 Y:2013 07 2013 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $7,988 $15,000 Not Implemented
TT0109 # 01 Y:2013 01 2013 ADJUST BURNERS FOR EFFICIENT OPERATION $3,611 $50 Implemented
TT0109 # 02 Y:2013 02 2013 OPTIMIZE PLANT POWER FACTOR $17,524 $25,600 Not Implemented
TT0109 # 03 Y:2013 03 2013 UPGRADE CONTROLS ON COMPRESSORS $7,651 $25 Implemented
TT0109 # 04 Y:2013 04 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,206 $63 Implemented
TT0109 # 05 Y:2013 05 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,030 $20,000 Implemented
TT0109 # 06 Y:2013 06 2013 APPLY FOR INVESTMENT INCENTIVES $2,271 $0 Implemented
TT0111 # 01 Y:2013 01 2013 FLASH CONDENSATE TO PRODUCE LOWER PRESSURE STEAM $6,000 $5,000 Not Implemented
TT0111 # 02 Y:2013 02 2013 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $17,000 $50,000 Not Implemented
TT0111 # 03 Y:2013 03 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,000 $5,000 Implemented
TT0111 # 04 Y:2013 04 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,000 $4,000 Implemented
TT0111 # 05 Y:2013 05 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,000 $1,500 Implemented
TT0117 # 01 Y:2013 01 2013 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $8,640 $0 Implemented
TT0117 # 02 Y:2013 02 2013 DISCONNECT BALLASTS $517 $0 Not Implemented