IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,582

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0048 # 05 Y:2003 05 2003 DIRECT WARMEST AIR TO COMBUSTION INTAKE $1,040 $947 Not Implemented
UU0048 # 06 Y:2003 06 2003 REPAIR OR REPLACE STEAM TRAPS $16,294 $5,000 Not Implemented
UU0048 # 07 Y:2003 07 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $480 $0 Not Implemented
UU0048 # 08 Y:2003 08 2003 INSTALL / REPAIR INSULATION ON STEAM LINES $493 $518 Not Implemented
UU0048 # 09 Y:2003 09 2003 RECOVER AND REUSE COOLING WATER $9,920 $7,907 Not Implemented
UU0048 # 10 Y:2003 10 2003 REUSE / RECYCLE/ SELL RUBBER PRODUCTS $1 $0 Not Implemented
UU0047 # 01 Y:2003 01 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,212 $710 Implemented
UU0047 # 02 Y:2003 02 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,536 $4,800 Not Implemented
UU0047 # 03 Y:2003 03 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,044 $9,000 Implemented
UU0047 # 04 Y:2003 04 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,693 $0 Not Implemented
UU0047 # 05 Y:2003 05 2003 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $3,430 $7,126 Not Implemented
UU0047 # 06 Y:2003 06 2003 INSTALL OCCUPANCY SENSORS $301 $150 Implemented
UU0047 # 07 Y:2003 07 2003 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $4,941 $765 Not Implemented
UU0045 # 01 Y:2003 01 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,900 $0 n/a
UU0045 # 02 Y:2003 02 2003 OPTIMIZE PLANT POWER FACTOR $5,967 $0 n/a
UU0045 # 03 Y:2003 03 2003 REPAIR AND ELIMINATE STEAM LEAKS $1,500 $550 n/a
UU0045 # 04 Y:2003 04 2003 RECOVER WASTE HEAT FROM EQUIPMENT $2,090 $886 n/a
UU0045 # 05 Y:2003 05 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,079 $320 n/a
UU0046 # 01 Y:2003 01 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $16,936 $5,500 Not Implemented
UU0046 # 02 Y:2003 02 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $50,075 $0 Not Implemented
UU0046 # 03 Y:2003 03 2003 OPTIMIZE PLANT POWER FACTOR $12,187 $14,400 Not Implemented
UU0046 # 04 Y:2003 04 2003 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,186 $9,000 Not Implemented
UU0046 # 05 Y:2003 05 2003 INSTALL OCCUPANCY SENSORS $6,168 $750 Not Implemented
UU0046 # 06 Y:2003 06 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,686 $7,815 Implemented
UU0046 # 07 Y:2003 07 2003 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $5,727 $3,889 Not Implemented