IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,317

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0354 # 05 Y:2007 05 2007 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $3,489 $1,000 Implemented
WV0354 # 06 Y:2007 06 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,629 $0 Implemented
WV0354 # 07 Y:2007 07 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,596 $32 Implemented
WV0354 # 08 Y:2007 08 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,776 $0 Implemented
WV0354 # 09 Y:2007 09 2007 UTILIZE A LESS EXPENSIVE COOLING METHOD $1,465 $1,032 Not Implemented
WV0354 # 10 Y:2007 10 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,332 $186 Not Implemented
WV0354 # 11 Y:2007 11 2007 DEVELOP A REPAIR/REPLACE POLICY $1,190 $408 Implemented
WV0354 # 12 Y:2007 12 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,070 $1,044 Not Implemented
WV0354 # 13 Y:2007 13 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $857 $504 Implemented
WV0343 # 01 Y:2006 01 2006 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $1,166,408 $1,460,000 Not Implemented
WV0343 # 02 Y:2006 02 2006 PREHEAT COMBUSTION AIR WITH WASTE HEAT $1,096,704 $1,539,100 Not Implemented
WV0343 # 03 Y:2006 03 2006 INSULATE BARE EQUIPMENT $21,955 $3,114 Implemented
WV0343 # 04 Y:2006 04 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,918 $0 Implemented
WV0343 # 05 Y:2006 05 2006 RECOVER WASTE HEAT FROM EQUIPMENT $11,836 $2,255 Not Implemented
WV0343 # 06 Y:2006 06 2006 DEVELOP A REPAIR/REPLACE POLICY $4,236 $635 Implemented
WV0341 # 01 Y:2006 01 2006 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $7,713 $2,370 Implemented
WV0341 # 02 Y:2006 02 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,073 $1,800 Implemented
WV0341 # 03 Y:2006 03 2006 INSULATE BARE EQUIPMENT $2,679 $543 Implemented
WV0341 # 04 Y:2006 04 2006 PREHEAT COMBUSTION AIR WITH WASTE HEAT $2,635 $2,695 Not Implemented
WV0341 # 05 Y:2006 05 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,388 $625 Implemented
WV0341 # 06 Y:2006 06 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,532 $600 Not Implemented
WV0341 # 07 Y:2006 07 2006 INSTALL SPECTRAL REFLECTORS / DELAMP $1,368 $2,700 Not Implemented
WV0341 # 08 Y:2006 08 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,253 $1,270 Implemented
WV0341 # 09 Y:2006 09 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $850 $0 Implemented
WV0341 # 10 Y:2006 10 2006 UTILIZE A LESS EXPENSIVE COOLING METHOD $571 $525 Not Implemented