Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,715
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0946 # 06 Y:2016 | 06 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,159 | $7,320 | Implemented |
OK0946 # 07 Y:2016 | 07 | 2016 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $7,353 | $0 | Not Implemented |
OK0946 # 08 Y:2016 | 08 | 2016 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $2,226 | $0 | Not Implemented |
SD0535 # 01 Y:2016 | 01 | 2016 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $324,317 | $112,783 | Implemented |
SD0535 # 02 Y:2016 | 02 | 2016 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $110,770 | $402,000 | Not Implemented |
SD0535 # 03 Y:2016 | 03 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $25,449 | $42,926 | Implemented |
SD0535 # 04 Y:2016 | 04 | 2016 | OPTIMIZE PLANT POWER FACTOR | $9,321 | $3,181 | Not Implemented |
SD0535 # 05 Y:2016 | 05 | 2016 | INSTALL OCCUPANCY SENSORS | $7,184 | $6,400 | Implemented |
SD0535 # 06 Y:2016 | 06 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,708 | $200 | Not Implemented |
SD0535 # 07 Y:2016 | 07 | 2016 | USE WASTE HEAT STEAM FOR ABSORPTION REFRIGERATION | $710 | $3,100 | Not Implemented |
CO0727 # 01 Y:2016 | 01 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,370 | $150 | n/a |
CO0727 # 02 Y:2016 | 02 | 2016 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $970 | $1,000 | n/a |
CO0727 # 03 Y:2016 | 03 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,140 | $26,760 | n/a |
CO0727 # 04 Y:2016 | 04 | 2016 | INSTALL OCCUPANCY SENSORS | $2,660 | $2,570 | n/a |
CO0727 # 05 Y:2016 | 05 | 2016 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $550 | $2,280 | n/a |
CO0727 # 06 Y:2016 | 06 | 2016 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $250 | $280 | n/a |
UA0166 # 01 Y:2016 | 01 | 2016 | UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM | $93,758 | $199,325 | Not Implemented |
UA0166 # 02 Y:2016 | 02 | 2016 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $25,491 | $80 | Implemented |
UA0166 # 03 Y:2016 | 03 | 2016 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $26,248 | $80 | Implemented |
UA0166 # 04 Y:2016 | 04 | 2016 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $14,642 | $59,120 | Not Implemented |
UA0166 # 05 Y:2016 | 05 | 2016 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $1,707 | $120 | Implemented |
UA0166 # 06 Y:2016 | 06 | 2016 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $617 | $200 | Implemented |
UA0166 # 07 Y:2016 | 07 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $25,666 | $38,071 | Implemented |
UA0166 # 08 Y:2016 | 08 | 2016 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,753 | $1,050 | Implemented |
AM0713 # 01 Y:2016 | 01 | 2016 | INSTALL WASTE HEAT BOILER TO PROVIDE DIRECT POWER | $453,910 | $3,100,000 | Not Implemented |