IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

144,267

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0049 # 05 Y:1995 05 1995 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $4,950 $3,400 Implemented
WV0049 # 06 Y:1995 06 1995 INSTALL / REPAIR INSULATION ON STEAM LINES $3,841 $7,136 Implemented
WV0049 # 07 Y:1995 07 1995 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $14,602 $3,440 Not Implemented
WV0049 # 08 Y:1995 08 1995 REPAIR AND ELIMINATE STEAM LEAKS $7,654 $600 Not Implemented
WV0049 # 09 Y:1995 09 1995 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $14,328 $215 Not Implemented
WV0049 # 10 Y:1995 10 1995 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $27,456 $65,000 Not Implemented
MO0138 # 01 Y:1995 01 1995 PAY UTILITY BILLS ON TIME $40,772 $0 Implemented
MO0138 # 02 Y:1995 02 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,269 $848 Implemented
MO0138 # 03 Y:1995 03 1995 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $19,282 $4,373 Not Implemented
MO0138 # 04 Y:1995 04 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $13,554 $46,209 Implemented
MO0138 # 05 Y:1995 05 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $9,489 $4,070 Not Implemented
MO0138 # 06 Y:1995 06 1995 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,397 $3,220 Not Implemented
MO0138 # 07 Y:1995 07 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,389 $16,600 Implemented
MO0138 # 08 Y:1995 08 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,657 $536 Implemented
MA0325 # 02 Y:1995 02 1995 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $4,067 $4,632 Not Implemented
MA0325 # 03 Y:1995 03 1995 RECOVER WASTE HEAT FROM EQUIPMENT $1,545 $2,500 Not Implemented
MA0325 # 04 Y:1995 04 1995 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,557 $1,000 Implemented
MA0325 # 05 Y:1995 05 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $922 $0 Implemented
MA0325 # 06 Y:1995 06 1995 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $453 $1,190 Implemented
MA0325 # 07 Y:1995 07 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $382 $0 Implemented
MA0325 # 08 Y:1995 08 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $378 $255 Implemented
MA0325 # 09 Y:1995 09 1995 RECOVER METALS FROM SPENT SOLUTIONS AND RECYCLE $28,487 $53,330 Implemented
MA0325 # 10 Y:1995 10 1995 RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER $7,953 $5,526 Implemented
MA0325 # 01 Y:1995 01 1995 COVER OPEN TANKS $3,618 $1,883 Implemented
AM0230 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,940 $6,480 Implemented