IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,553

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0183 # 05 Y:1990 05 1990 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,446 $100 Implemented
MA0179 # 01 Y:1990 01 1990 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $13,039 $43,000 Not Implemented
MA0179 # 02 Y:1990 02 1990 RECOVER AND REUSE COOLING WATER $10,670 $8,250 Implemented
MA0179 # 03 Y:1990 03 1990 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $11,908 $2,350 Not Implemented
MA0179 # 04 Y:1990 04 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $554 $70 Implemented
MA0177 # 01 Y:1990 01 1990 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $5,107 $14,700 Not Implemented
MA0177 # 02 Y:1990 02 1990 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $10,876 $21,853 Not Implemented
MA0177 # 03 Y:1990 03 1990 INSTALL TIMERS AND/OR THERMOSTATS $822 $120 Implemented
MA0177 # 04 Y:1990 04 1990 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,411 $8,500 Implemented
MA0172 # 03 Y:1990 03 1990 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,721 $326 Implemented
MA0172 # 01 Y:1990 01 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $499 $168 Implemented
MA0172 # 02 Y:1990 02 1990 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $4,911 $2,000 Implemented
MA0162 # 01 Y:1989 01 1989 USE DEMAND CONTROLLER OR LOAD SHEDDER $936 $75 Implemented
MA0162 # 02 Y:1989 02 1989 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $665 $50 Not Implemented
MA0162 # 03 Y:1989 03 1989 INSTALL EFFICIENT RECTIFIERS $14,209 $8,500 Not Implemented
MA0162 # 04 Y:1989 04 1989 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,765 $400 Not Implemented
MA0162 # 05 Y:1989 05 1989 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $636 $1,041 Not Implemented
MA0162 # 06 Y:1989 06 1989 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,259 $14,920 Not Implemented
MA0162 # 07 Y:1989 07 1989 INSTALL SET-BACK TIMERS $712 $150 Not Implemented
MA0157 # 01 Y:1989 01 1989 INSTALL SET-BACK TIMERS $363 $175 Not Implemented
MA0157 # 02 Y:1989 02 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,976 $466 Implemented
MA0157 # 03 Y:1989 03 1989 DE-ENERGIZE EXCESS TRANSFORMER CAPACITY $545 $584 Not Implemented
MA0157 # 04 Y:1989 04 1989 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $3,203 $6,025 Not Implemented
MA0157 # 05 Y:1989 05 1989 TURN OFF EQUIPMENT WHEN NOT IN USE $106 $0 Implemented
MA0153 # 01 Y:1989 01 1989 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $632 $217 Not Implemented