Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,573
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IP0071 # 02 Y:2016 | 02 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,868 | $5,332 | Not Implemented |
IP0071 # 03 Y:2016 | 03 | 2016 | INSULATE BARE EQUIPMENT | $2,687 | $2,183 | Not Implemented |
IP0071 # 04 Y:2016 | 04 | 2016 | INSTALL OCCUPANCY SENSORS | $106 | $136 | Not Implemented |
IP0071 # 05 Y:2016 | 05 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $705 | $2,374 | Not Implemented |
IP0070 # 01 Y:2016 | 01 | 2016 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $575 | $0 | Not Implemented |
IP0070 # 02 Y:2016 | 02 | 2016 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $8,543 | $74 | Implemented |
IP0070 # 03 Y:2016 | 03 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,137 | $40 | Implemented |
IP0070 # 04 Y:2016 | 04 | 2016 | INSTALL OCCUPANCY SENSORS | $996 | $113 | Implemented |
IP0070 # 05 Y:2016 | 05 | 2016 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $492 | $720 | Not Implemented |
IP0070 # 06 Y:2016 | 06 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,285 | $9,938 | Not Implemented |
IP0069 # 01 Y:2016 | 01 | 2016 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $490 | $0 | Implemented |
IP0069 # 02 Y:2016 | 02 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,282 | $21 | Implemented |
IP0069 # 03 Y:2016 | 03 | 2016 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $5,637 | $3 | Not Implemented |
IP0069 # 04 Y:2016 | 04 | 2016 | INSTALL OCCUPANCY SENSORS | $9,327 | $377 | Implemented |
IP0069 # 05 Y:2016 | 05 | 2016 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $50 | $5 | Not Implemented |
IP0069 # 06 Y:2016 | 06 | 2016 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $2,989 | $215 | Implemented |
IP0069 # 07 Y:2016 | 07 | 2016 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $27,384 | $7,218 | Implemented |
IP0069 # 08 Y:2016 | 08 | 2016 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $22,750 | $12,163 | Not Implemented |
IP0069 # 09 Y:2016 | 09 | 2016 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,712 | $1,271 | Not Implemented |
IP0069 # 10 Y:2016 | 10 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,756 | $4,316 | Implemented |
IP0069 # 11 Y:2016 | 11 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $231 | $351 | Implemented |
IP0069 # 12 Y:2016 | 12 | 2016 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $15,955 | $38,395 | Not Implemented |
IP0068 # 05 Y:2016 | 05 | 2016 | INSTALL OCCUPANCY SENSORS | $500 | $285 | Implemented |
IP0068 # 06 Y:2016 | 06 | 2016 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $136 | $82 | Not Implemented |
IP0068 # 07 Y:2016 | 07 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,287 | $5,648 | Implemented |