Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,289
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0465 # 08 Y:2012 | 08 | 2012 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,343 | $1,200 | Implemented |
NC0465 # 09 Y:2012 | 09 | 2012 | INCREASE AMOUNT OF CONDENSATE RETURNED | $2,179 | $1,000 | Implemented |
NC0465 # 10 Y:2012 | 10 | 2012 | INSULATE FEEDWATER TANK | $464 | $1,150 | Implemented |
NC0465 # 11 Y:2012 | 11 | 2012 | MINIMIZE BOILER BLOWDOWN WITH BETTER FEEDWATER TREATMENT | $1,007 | $1,000 | Implemented |
NC0462 # 01 Y:2012 | 01 | 2012 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $21,080 | $25,000 | Not Implemented |
NC0462 # 02 Y:2012 | 02 | 2012 | INSTALL EQUIPMENT TO UTILIZE WASTE FUEL | $107,890 | $305,000 | Not Implemented |
NC0462 # 03 Y:2012 | 03 | 2012 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $8,910 | $20,000 | Not Implemented |
NC0462 # 04 Y:2012 | 04 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,190 | $400 | Implemented |
NC0462 # 05 Y:2012 | 05 | 2012 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $102 | $200 | Implemented |
NC0462 # 06 Y:2012 | 06 | 2012 | RECOVER WASTE HEAT FROM EQUIPMENT | $7,686 | $11,000 | Implemented |
NC0462 # 07 Y:2012 | 07 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $36,392 | $8,400 | Implemented |
NC0462 # 08 Y:2012 | 08 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,997 | $18,991 | Implemented |
NC0462 # 09 Y:2012 | 09 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $174 | $220 | Implemented |
NC0462 # 10 Y:2012 | 10 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $528 | $508 | Not Implemented |
NC0461 # 01 Y:2012 | 01 | 2012 | USE WASTE HEAT STEAM FOR ABSORPTION REFRIGERATION | $163,689 | $410,000 | Not Implemented |
NC0461 # 02 Y:2012 | 02 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,912 | $7,160 | Implemented |
NC0461 # 03 Y:2012 | 03 | 2012 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $81,960 | $300,000 | Not Implemented |
NC0461 # 04 Y:2012 | 04 | 2012 | ADJUST BURNERS FOR EFFICIENT OPERATION | $24,541 | $2,400 | Implemented |
NC0461 # 05 Y:2012 | 05 | 2012 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $84,150 | $40,000 | Implemented |
NC0461 # 06 Y:2012 | 06 | 2012 | REDUCE EXCESSIVE BOILER BLOWDOWN | $4,695 | $0 | Implemented |
NC0461 # 07 Y:2012 | 07 | 2012 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $41,556 | $15,000 | Not Implemented |
NC0461 # 08 Y:2012 | 08 | 2012 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $458,904 | $314,375 | Implemented |
NC0459 # 01 Y:2012 | 01 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $25,477 | $67,898 | Implemented |
NC0459 # 02 Y:2012 | 02 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $44,453 | $152,640 | Implemented |
NC0459 # 03 Y:2012 | 03 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,925 | $8,552 | Implemented |