IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,530

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OD0165 # 05 Y:2000 05 2000 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE $31,722 $0 Implemented
OD0165 # 06 Y:2000 06 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,026 $2,400 Implemented
OD0164 # 01 Y:2000 01 2000 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE $4,040 $0 Not Implemented
OD0164 # 02 Y:2000 02 2000 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,088 $1,000 Not Implemented
OD0164 # 03 Y:2000 03 2000 METER WASTE WATER $1,000 $6,000 Not Implemented
OD0164 # 04 Y:2000 04 2000 METER WASTE WATER $3,200 $6,000 Not Implemented
OD0164 # 05 Y:2000 05 2000 PAY UTILITY BILLS ON TIME $209 $0 Not Implemented
OD0162 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,184 $2,257 Not Implemented
OD0162 # 02 Y:2000 02 2000 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $1,775 $1,870 Not Implemented
OD0163 # 01 Y:2000 01 2000 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $7,221 $1,000 Not Implemented
OD0163 # 02 Y:2000 02 2000 USE SYNTHETIC LUBRICANT $372 $67 Implemented
OD0163 # 03 Y:2000 03 2000 INSTALL OCCUPANCY SENSORS $50 $95 Not Implemented
OD0163 # 04 Y:2000 04 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $104 $285 Not Implemented
TN0687 # 01 Y:2000 01 2000 INSTALL REDUNDANT EQUIPMENT TO AVOID LOSSES CAUSED BY EQUIPMENT FAILURE AND ROUTINE MAINTENANCE $25,255 $1,075 Implemented
TN0687 # 02 Y:2000 02 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,703 $750 Implemented
TN0687 # 03 Y:2000 03 2000 TREAT AND REUSE RINSE WATERS $6,496 $14,340 Not Implemented
TN0687 # 04 Y:2000 04 2000 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $4,210 $820 Implemented
TN0687 # 05 Y:2000 05 2000 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $3,280 $2,925 Not Implemented
TN0687 # 06 Y:2000 06 2000 INSTALL TIMERS AND/OR THERMOSTATS $2,289 $2,150 Implemented
TN0687 # 07 Y:2000 07 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,680 $350 Implemented
TN0687 # 08 Y:2000 08 2000 INSULATE BARE EQUIPMENT $1,562 $188 Not Implemented
TN0687 # 09 Y:2000 09 2000 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $893 $2,950 Not Implemented
TN0687 # 10 Y:2000 10 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $720 $0 Implemented
OD0161 # 01 Y:2000 01 2000 INSULATE BARE EQUIPMENT $2,365 $5,892 Not Implemented
OD0161 # 02 Y:2000 02 2000 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $3,900 $3,000 Not Implemented