IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,317

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0341 # 11 Y:2006 11 2006 DEVELOP A REPAIR/REPLACE POLICY $501 $213 Implemented
WV0341 # 12 Y:2006 12 2006 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $498 $25 Not Implemented
WV0333 # 01 Y:2006 01 2006 BURN WASTE OIL FOR HEAT $23,934 $19,500 Not Implemented
WV0333 # 02 Y:2006 02 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,663 $195 Implemented
WV0333 # 03 Y:2006 03 2006 DEVELOP A REPAIR/REPLACE POLICY $2,692 $544 Implemented
WV0333 # 04 Y:2006 04 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,819 $800 Implemented
WV0333 # 05 Y:2006 05 2006 INSTALL OCCUPANCY SENSORS $397 $210 Not Implemented
WV0333 # 06 Y:2006 06 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $460 $0 Not Implemented
WV0332 # 01 Y:2006 01 2006 INSULATE BARE EQUIPMENT $26,457 $2,863 Implemented
WV0332 # 02 Y:2006 02 2006 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $14,629 $65,300 Not Implemented
WV0332 # 03 Y:2006 03 2006 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $10,110 $17,100 Not Implemented
WV0332 # 04 Y:2006 04 2006 DEVELOP A REPAIR/REPLACE POLICY $4,584 $765 Implemented
WV0332 # 05 Y:2006 05 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,028 $0 Implemented
WV0332 # 06 Y:2006 06 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,921 $0 Implemented
WV0332 # 07 Y:2006 07 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,100 $8,245 Implemented
WV0332 # 08 Y:2006 08 2006 UTILIZE A LESS EXPENSIVE COOLING METHOD $1,280 $0 Not Implemented
WV0332 # 09 Y:2006 09 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $955 $190 Not Implemented
WV0332 # 10 Y:2006 10 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $411 $150 Not Implemented
WV0332 # 11 Y:2006 11 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $214 $123 Not Implemented
WV0327 # 01 Y:2005 01 2005 INSULATE BARE EQUIPMENT $11,686 $2,140 Implemented
WV0327 # 02 Y:2005 02 2005 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $9,890 $3,960 Not Implemented
WV0327 # 03 Y:2005 03 2005 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $8,323 $3,960 Implemented
WV0327 # 04 Y:2005 04 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,759 $1,000 Implemented
WV0327 # 05 Y:2005 05 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,613 $2,644 Not Implemented
WV0327 # 06 Y:2005 06 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,057 $696 Implemented