IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,474

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0442 # 09 Y:1994 09 1994 RECOVER WASTE HEAT FROM EQUIPMENT $1,195 $8,640 Implemented
KU0442 # 10 Y:1994 10 1994 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $435 $400 Implemented
KU0442 # 11 Y:1994 11 1994 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $271 $130 Implemented
AS0129 # 01 Y:1994 01 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,621 $4,905 Not Implemented
AS0129 # 02 Y:1994 02 1994 INSTALL OCCUPANCY SENSORS $107 $150 Not Implemented
AS0129 # 03 Y:1994 03 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,771 $7,024 Implemented
AS0129 # 04 Y:1994 04 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,468 $0 Implemented
AS0129 # 05 Y:1994 05 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $870 $700 Implemented
AS0129 # 06 Y:1994 06 1994 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,761 $2,500 Implemented
CO0312 # 01 Y:1994 01 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,660 $3,200 Implemented
CO0312 # 02 Y:1994 02 1994 INSTALL TIMERS AND/OR THERMOSTATS $1,960 $1,050 Implemented
CO0312 # 03 Y:1994 03 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,410 $210 Not Implemented
CO0312 # 04 Y:1994 04 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $790 $-290 Implemented
CO0312 # 05 Y:1994 05 1994 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $500 $150 Not Implemented
CO0312 # 06 Y:1994 06 1994 INSULATE BARE EQUIPMENT $380 $320 Implemented
CO0312 # 07 Y:1994 07 1994 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $300 $100 Not Implemented
SD0096 # 01 Y:1994 01 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $29,182 $22,260 Implemented
SD0096 # 02 Y:1994 02 1994 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $18,252 $73,354 Not Implemented
SD0096 # 03 Y:1994 03 1994 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,565 $0 Not Implemented
SD0096 # 04 Y:1994 04 1994 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $90,168 $27,490 Not Implemented
SD0096 # 05 Y:1994 05 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,631 $11,471 Implemented
SD0096 # 06 Y:1994 06 1994 INSTALL SPECTRAL REFLECTORS / DELAMP $6,477 $5,450 Not Implemented
SD0096 # 07 Y:1994 07 1994 INSTALL OCCUPANCY SENSORS $706 $616 Not Implemented
MO0128 # 01 Y:1994 01 1994 COVER OPEN TANKS $68,575 $17,810 Implemented
MO0128 # 02 Y:1994 02 1994 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $27,900 $525 Implemented