Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,002
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
BS0004 # 07 Y:2012 | 07 | 2012 | REUSE / RECYCLE/ SELL PAPER PRODUCTS | $1,240 | $119 | Not Implemented |
UD0863 # 01 Y:2012 | 01 | 2012 | TREAT AND REUSE RINSE WATERS | $23,578 | $1,000 | Not Implemented |
UD0863 # 02 Y:2012 | 02 | 2012 | COMBINE UTILITY METERS | $4,421 | $8,842 | Not Implemented |
UD0863 # 03 Y:2012 | 03 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,407 | $16,259 | Implemented |
UD0863 # 04 Y:2012 | 04 | 2012 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $557 | $0 | Implemented |
UD0863 # 05 Y:2012 | 05 | 2012 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $16,871 | $8,000 | Not Implemented |
UD0863 # 06 Y:2012 | 06 | 2012 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $18,285 | $9,900 | Not Implemented |
UD0863 # 07 Y:2012 | 07 | 2012 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $16,249 | $0 | Implemented |
UD0863 # 08 Y:2012 | 08 | 2012 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $8,548 | $2,000 | Not Implemented |
UD0863 # 09 Y:2012 | 09 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,856 | $1,000 | Implemented |
UD0863 # 10 Y:2012 | 10 | 2012 | REPAIR OR REPLACE STEAM TRAPS | $13,284 | $0 | Implemented |
UD0863 # 11 Y:2012 | 11 | 2012 | REPAIR OR REPLACE STEAM TRAPS | $10,008 | $2,600 | Implemented |
UD0863 # 12 Y:2012 | 12 | 2012 | REDUCE EXCESSIVE BOILER BLOWDOWN | $4,619 | $12,800 | Not Implemented |
UD0863 # 13 Y:2012 | 13 | 2012 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $43,532 | $0 | Implemented |
UD0863 # 14 Y:2012 | 14 | 2012 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $23,215 | $14,000 | Not Implemented |
UA3022 # 01 Y:2012 | 01 | 2012 | TURN OFF EQUIPMENT WHEN NOT IN USE | $54,140 | $50 | Not Implemented |
UA3022 # 02 Y:2012 | 02 | 2012 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $31,511 | $15,063 | Not Implemented |
UA3022 # 03 Y:2012 | 03 | 2012 | TURN OFF EQUIPMENT WHEN NOT IN USE | $12,180 | $50 | Not Implemented |
UA3022 # 04 Y:2012 | 04 | 2012 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $64,995 | $90,750 | Not Implemented |
AM0617 # 01 Y:2012 | 01 | 2012 | DEVELOP STANDARD OPERATING PROCEDURES | $191,786 | $6,200 | Not Implemented |
AM0617 # 02 Y:2012 | 02 | 2012 | RECOVER WASTE HEAT FROM EQUIPMENT | $153,000 | $375,000 | Not Implemented |
AM0617 # 03 Y:2012 | 03 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,264 | $2,775 | Implemented |
AM0617 # 04 Y:2012 | 04 | 2012 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $2,146 | $0 | Implemented |
AM0617 # 05 Y:2012 | 05 | 2012 | INSTALL OCCUPANCY SENSORS | $2,056 | $1,562 | Implemented |
AM0617 # 06 Y:2012 | 06 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,871 | $64 | Implemented |