IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,715

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0535 # 04 Y:2016 04 2016 OPTIMIZE PLANT POWER FACTOR $9,321 $3,181 Not Implemented
SD0535 # 05 Y:2016 05 2016 INSTALL OCCUPANCY SENSORS $7,184 $6,400 Implemented
SD0535 # 06 Y:2016 06 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,708 $200 Not Implemented
SD0535 # 07 Y:2016 07 2016 USE WASTE HEAT STEAM FOR ABSORPTION REFRIGERATION $710 $3,100 Not Implemented
MA0758 # 01 Y:2016 01 2016 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $2,549 $2,836 Implemented
MA0758 # 02 Y:2016 02 2016 REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS $2,464 $500 Implemented
MA0758 # 03 Y:2016 03 2016 INSTALL OCCUPANCY SENSORS $2,272 $1,450 Implemented
MA0758 # 04 Y:2016 04 2016 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $917 $960 Implemented
MA0758 # 05 Y:2016 05 2016 REDUCE VENTILATION AIR $754 $3,000 Not Implemented
MA0758 # 06 Y:2016 06 2016 PAY UTILITY BILLS ON TIME $672 $500 Implemented
AM0712 # 01 Y:2016 01 2016 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $48,140 $2,710 Not Implemented
AM0712 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,510 $46,840 Not Implemented
AM0712 # 03 Y:2016 03 2016 OPTIMIZE PLANT POWER FACTOR $11,700 $26,740 Not Implemented
AM0712 # 04 Y:2016 04 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,710 $30 Not Implemented
AM0712 # 05 Y:2016 05 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $450 $200 Not Implemented
AM0712 # 06 Y:2016 06 2016 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $400 $0 Not Implemented
AM0712 # 07 Y:2016 07 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $350 $150 Not Implemented
AM0712 # 08 Y:2016 08 2016 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $110 $280 Not Implemented
SD0534 # 01 Y:2016 01 2016 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $17,516 $28,660 Not Implemented
SD0534 # 02 Y:2016 02 2016 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $12,021 $5,775 Implemented
SD0534 # 03 Y:2016 03 2016 REDUCE HEAT GAIN BY WINDOW TINTING $5,102 $15,750 Not Implemented
SD0534 # 04 Y:2016 04 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,898 $9,052 Implemented
SD0534 # 05 Y:2016 05 2016 USE WASTE HEAT STEAM FOR ABSORPTION REFRIGERATION $2,674 $2,863 Not Implemented
SD0534 # 06 Y:2016 06 2016 USE PHOTOCELL CONTROLS $2,143 $1,850 Not Implemented
SD0534 # 07 Y:2016 07 2016 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,762 $3,097 Not Implemented