IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

143,647

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0430 # 06 Y:1994 06 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $191 $444 Not Implemented
OK0430 # 07 Y:1994 07 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $68 $0 Not Implemented
UD0425 # 01 Y:1994 01 1994 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,450 $0 Implemented
UD0425 # 02 Y:1994 02 1994 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $9,026 $0 Not Implemented
UD0425 # 03 Y:1994 03 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $398 $3,000 Implemented
UD0425 # 04 Y:1994 04 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,545 $15,950 Implemented
UD0425 # 05 Y:1994 05 1994 COMBINE UTILITY METERS $355 $0 Implemented
UD0426 # 01 Y:1994 01 1994 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $24,064 $500 Implemented
UD0426 # 02 Y:1994 02 1994 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,565 $38,000 Implemented
UD0426 # 03 Y:1994 03 1994 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,342 $0 Not Implemented
UD0426 # 04 Y:1994 04 1994 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,032 $400 Implemented
UD0426 # 05 Y:1994 05 1994 RECOVER WASTE HEAT FROM EQUIPMENT $1,752 $2,000 Implemented
AR0020 # 01 Y:1994 01 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,988 $250 Implemented
AR0020 # 02 Y:1994 02 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,843 $1,300 Implemented
AR0020 # 03 Y:1994 03 1994 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $3,547 $5,250 Implemented
AR0020 # 04 Y:1994 04 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,351 $2,100 Implemented
AR0020 # 05 Y:1994 05 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,102 $712 Implemented
AR0020 # 06 Y:1994 06 1994 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,983 $670 Implemented
GT0521 # 01 Y:1994 01 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,060 $21,660 Implemented
GT0521 # 02 Y:1994 02 1994 DISCONNECT BALLASTS $360 $640 Implemented
GT0521 # 03 Y:1994 03 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $9,620 $17,130 Implemented
GT0521 # 04 Y:1994 04 1994 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $580 $1,920 Not Implemented
GT0521 # 05 Y:1994 05 1994 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $6,070 $4,600 Not Implemented
GT0521 # 06 Y:1994 06 1994 USE MINIMUM STEAM OPERATING PRESSURE $200 $0 Implemented
GT0521 # 07 Y:1994 07 1994 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,770 $13,000 Not Implemented