Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
7,713
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0526 # 04 Y:2019 | 04 | 2019 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,403 | $0 | Implemented |
UF0526 # 05 Y:2019 | 05 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,088 | $496 | Implemented |
UF0526 # 06 Y:2019 | 06 | 2019 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $3,132 | $9,341 | Implemented |
UF0526 # 07 Y:2019 | 07 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,738 | $13,541 | Implemented |
MI0350 # 01 Y:2019 | 01 | 2019 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $234,952 | $172,151 | Implemented |
MI0350 # 02 Y:2019 | 02 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $137,608 | $23,779 | Implemented |
MI0350 # 03 Y:2019 | 03 | 2019 | USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS | $65,500 | $142,400 | Not Implemented |
MI0350 # 04 Y:2019 | 04 | 2019 | INSULATE BARE EQUIPMENT | $36,067 | $25,990 | Not Implemented |
MI0350 # 05 Y:2019 | 05 | 2019 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $21,816 | $46,090 | Not Implemented |
MI0350 # 06 Y:2019 | 06 | 2019 | ADD AIR SHIELDS TO TRUCKS TO INCREASE FUEL MILEAGE | $18,916 | $13,100 | Not Implemented |
MI0350 # 07 Y:2019 | 07 | 2019 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $18,627 | $1,126 | Implemented |
MI0350 # 08 Y:2019 | 08 | 2019 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $12,352 | $3,860 | Not Implemented |
MI0350 # 09 Y:2019 | 09 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $8,638 | $200 | Not Implemented |
MI0350 # 10 Y:2019 | 10 | 2019 | INCREASE EFFICIENCY OF TRUCKS | $6,123 | $5,800 | Not Implemented |
MI0350 # 11 Y:2019 | 11 | 2019 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $3,540 | $6,160 | Not Implemented |
MI0350 # 12 Y:2019 | 12 | 2019 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $2,203 | $410 | Implemented |
MI0350 # 13 Y:2019 | 13 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,052 | $80 | Implemented |
UF0525 # 01 Y:2019 | 01 | 2019 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $13,580 | $31,585 | Implemented |
UF0525 # 02 Y:2019 | 02 | 2019 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $13,500 | $33,800 | Not Implemented |
UF0525 # 03 Y:2019 | 03 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,245 | $18,331 | Implemented |
UF0525 # 04 Y:2019 | 04 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,084 | $4,798 | Implemented |
UF0525 # 05 Y:2019 | 05 | 2019 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $3,145 | $3,960 | Implemented |
UF0525 # 06 Y:2019 | 06 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,312 | $464 | Implemented |
UF0525 # 07 Y:2019 | 07 | 2019 | ISOLATE HOT OR COLD EQUIPMENT | $1,061 | $2,108 | Not Implemented |
UF0525 # 08 Y:2019 | 08 | 2019 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $35,380 | $15,216 | Not Implemented |