IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,063

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0052 # 06 Y:2014 06 2014 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $6,489 $9,750 Not Implemented
WM0052 # 07 Y:2014 07 2014 INSULATE BARE EQUIPMENT $2,595 $2,500 Not Implemented
WM0052 # 08 Y:2014 08 2014 INSTALL OCCUPANCY SENSORS $391 $375 Implemented
WM0051 # 01 Y:2014 01 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $46,648 $27,260 Implemented
WM0051 # 02 Y:2014 02 2014 INSTALL OCCUPANCY SENSORS $15,358 $6,250 Not Implemented
WM0051 # 03 Y:2014 03 2014 INSULATE BARE EQUIPMENT $2,736 $800 Not Implemented
WM0051 # 04 Y:2014 04 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,050 $225 Implemented
WM0051 # 05 Y:2014 05 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,680 $3,200 Not Implemented
WM0051 # 06 Y:2014 06 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $18,680 $5,175 Not Implemented
WM0051 # 07 Y:2014 07 2014 PREHEAT COMBUSTION AIR WITH WASTE HEAT $9,345 $35,000 Not Implemented
WM0051 # 08 Y:2014 08 2014 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $14,378 $3,000 Not Implemented
WM0051 # 09 Y:2014 09 2014 REPLACE BOILER $11,306 $16,000 Implemented
IA0520 # 01 Y:2014 01 2014 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $4,603 $2,179 Implemented
IA0520 # 02 Y:2014 02 2014 INSTALL OCCUPANCY SENSORS $2,673 $3,050 Not Implemented
IA0520 # 03 Y:2014 03 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,486 $234 Implemented
IA0520 # 04 Y:2014 04 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,512 $5,026 Not Implemented
IA0520 # 05 Y:2014 05 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $490 $35 Not Implemented
IA0520 # 06 Y:2014 06 2014 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $429 $253 Implemented
IA0520 # 07 Y:2014 07 2014 INSTALL OCCUPANCY SENSORS $523 $888 Not Implemented
IA0520 # 08 Y:2014 08 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $290 $392 Implemented
IA0520 # 09 Y:2014 09 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,389 $321 Not Implemented
IA0520 # 10 Y:2014 10 2014 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,139 $1,000 Not Implemented
WM0049 # 01 Y:2014 01 2014 REDESIGN PROCESS $84,202 $409,525 Not Implemented
WM0049 # 02 Y:2014 02 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $10,079 $0 Implemented
WM0049 # 03 Y:2014 03 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $30,995 $44,750 Not Implemented