Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,377
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0028 # 03 Y:1985 | 03 | 1985 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $218 | $262 | Not Implemented |
MA0028 # 04 Y:1985 | 04 | 1985 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,497 | $94 | Implemented |
MA0028 # 05 Y:1985 | 05 | 1985 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $606 | $209 | Not Implemented |
MA0029 # 01 Y:1985 | 01 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $344 | $94 | Not Implemented |
MA0029 # 02 Y:1985 | 02 | 1985 | USE DIRECT AIR SUPPLY TO EXHAUST HOODS | $17,454 | $9,015 | Not Implemented |
MA0029 # 03 Y:1985 | 03 | 1985 | RECOVER WASTE HEAT FROM EQUIPMENT | $6,980 | $268 | Not Implemented |
MA0029 # 04 Y:1985 | 04 | 1985 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $636 | $763 | Not Implemented |
MA0029 # 05 Y:1985 | 05 | 1985 | REDUCE FLUID FLOW RATES | $2,655 | $0 | Not Implemented |
MA0029 # 06 Y:1985 | 06 | 1985 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,968 | $2,000 | Not Implemented |
MA0030 # 01 Y:1985 | 01 | 1985 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,013 | $1,515 | Implemented |
MA0030 # 02 Y:1985 | 02 | 1985 | INSULATE BARE EQUIPMENT | $1,095 | $1,536 | Implemented |
MA0030 # 03 Y:1985 | 03 | 1985 | INSTALL / REPAIR INSULATION ON STEAM LINES | $135 | $214 | Implemented |
MA0030 # 04 Y:1985 | 04 | 1985 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $10,416 | $8,764 | Implemented |
MA0030 # 05 Y:1985 | 05 | 1985 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $9,923 | $15,106 | Not Implemented |
KU0162 # 01 Y:1985 | 01 | 1985 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,801 | $4,838 | Not Implemented |
KU0162 # 02 Y:1985 | 02 | 1985 | INSULATE BARE EQUIPMENT | $3,684 | $782 | Not Implemented |
KU0162 # 03 Y:1985 | 03 | 1985 | IMPROVE LUBRICATION PRACTICES | $5,315 | $2,000 | Not Implemented |
KU0162 # 04 Y:1985 | 04 | 1985 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $2,058 | $3,000 | Not Implemented |
KU0162 # 05 Y:1985 | 05 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,210 | $4,973 | Not Implemented |
KU0162 # 06 Y:1985 | 06 | 1985 | INSTALL TIMERS AND/OR THERMOSTATS | $2,763 | $47 | Not Implemented |
KU0162 # 07 Y:1985 | 07 | 1985 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,074 | $7 | Not Implemented |
KU0162 # 08 Y:1985 | 08 | 1985 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $395 | $0 | Not Implemented |
KU0162 # 09 Y:1985 | 09 | 1985 | INSTALL AUTOMATIC STACK DAMPER | $405 | $700 | Not Implemented |
KU0162 # 10 Y:1985 | 10 | 1985 | RECOVER WASTE HEAT FROM EQUIPMENT | $594 | $500 | Not Implemented |
KU0162 # 11 Y:1985 | 11 | 1985 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $391 | $150 | Not Implemented |