IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,377

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0028 # 03 Y:1985 03 1985 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $218 $262 Not Implemented
MA0028 # 04 Y:1985 04 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,497 $94 Implemented
MA0028 # 05 Y:1985 05 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $606 $209 Not Implemented
MA0029 # 01 Y:1985 01 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $344 $94 Not Implemented
MA0029 # 02 Y:1985 02 1985 USE DIRECT AIR SUPPLY TO EXHAUST HOODS $17,454 $9,015 Not Implemented
MA0029 # 03 Y:1985 03 1985 RECOVER WASTE HEAT FROM EQUIPMENT $6,980 $268 Not Implemented
MA0029 # 04 Y:1985 04 1985 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $636 $763 Not Implemented
MA0029 # 05 Y:1985 05 1985 REDUCE FLUID FLOW RATES $2,655 $0 Not Implemented
MA0029 # 06 Y:1985 06 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,968 $2,000 Not Implemented
MA0030 # 01 Y:1985 01 1985 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,013 $1,515 Implemented
MA0030 # 02 Y:1985 02 1985 INSULATE BARE EQUIPMENT $1,095 $1,536 Implemented
MA0030 # 03 Y:1985 03 1985 INSTALL / REPAIR INSULATION ON STEAM LINES $135 $214 Implemented
MA0030 # 04 Y:1985 04 1985 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $10,416 $8,764 Implemented
MA0030 # 05 Y:1985 05 1985 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $9,923 $15,106 Not Implemented
KU0162 # 01 Y:1985 01 1985 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,801 $4,838 Not Implemented
KU0162 # 02 Y:1985 02 1985 INSULATE BARE EQUIPMENT $3,684 $782 Not Implemented
KU0162 # 03 Y:1985 03 1985 IMPROVE LUBRICATION PRACTICES $5,315 $2,000 Not Implemented
KU0162 # 04 Y:1985 04 1985 USE DEMAND CONTROLLER OR LOAD SHEDDER $2,058 $3,000 Not Implemented
KU0162 # 05 Y:1985 05 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,210 $4,973 Not Implemented
KU0162 # 06 Y:1985 06 1985 INSTALL TIMERS AND/OR THERMOSTATS $2,763 $47 Not Implemented
KU0162 # 07 Y:1985 07 1985 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,074 $7 Not Implemented
KU0162 # 08 Y:1985 08 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $395 $0 Not Implemented
KU0162 # 09 Y:1985 09 1985 INSTALL AUTOMATIC STACK DAMPER $405 $700 Not Implemented
KU0162 # 10 Y:1985 10 1985 RECOVER WASTE HEAT FROM EQUIPMENT $594 $500 Not Implemented
KU0162 # 11 Y:1985 11 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $391 $150 Not Implemented