Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,105
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IA0326 # 06 Y:2003 | 06 | 2003 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,079 | $163 | Implemented |
IA0326 # 07 Y:2003 | 07 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $321 | $552 | Not Implemented |
IA0326 # 08 Y:2003 | 08 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $46 | $62 | Implemented |
UM0241 # 01 Y:2003 | 01 | 2003 | CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE | $573,000 | $390,000 | Not Implemented |
UM0241 # 02 Y:2003 | 02 | 2003 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $17,350 | $8,000 | Implemented |
UM0241 # 03 Y:2003 | 03 | 2003 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $8,900 | $4,800 | Not Implemented |
UM0241 # 04 Y:2003 | 04 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,270 | $10,510 | Implemented |
UM0241 # 05 Y:2003 | 05 | 2003 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $4,275 | $2,100 | Implemented |
UM0241 # 06 Y:2003 | 06 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $910 | $75 | Implemented |
UU0053 # 01 Y:2003 | 01 | 2003 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,354 | $4,100 | Not Implemented |
UU0053 # 02 Y:2003 | 02 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $11,131 | $55 | Not Implemented |
UU0053 # 03 Y:2003 | 03 | 2003 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,710 | $2,000 | Not Implemented |
UU0053 # 04 Y:2003 | 04 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,112 | $70,635 | Not Implemented |
UU0053 # 05 Y:2003 | 05 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,869 | $2,340 | Implemented |
UU0053 # 06 Y:2003 | 06 | 2003 | INSTALL TURBULATORS | $2,610 | $1,572 | Not Implemented |
SU0165 # 01 Y:2003 | 01 | 2003 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $99,450 | $110,400 | Implemented |
SU0165 # 02 Y:2003 | 02 | 2003 | RECOVER AND REUSE SPENT ACID BATHS | $30,138 | $3,234 | Implemented |
SU0165 # 03 Y:2003 | 03 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $17,370 | $17,064 | Implemented |
SU0165 # 04 Y:2003 | 04 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,503 | $937 | Implemented |
SU0165 # 05 Y:2003 | 05 | 2003 | OPTIMIZE PLANT POWER FACTOR | $9,177 | $20,736 | Not Implemented |
SU0165 # 06 Y:2003 | 06 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $8,763 | $5,538 | Not Implemented |
SU0165 # 07 Y:2003 | 07 | 2003 | UPGRADE CONTROLS ON COMPRESSORS | $93,620 | $94,691 | Implemented |
MS0233 # 01 Y:2003 | 01 | 2003 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $200,928 | $9,650 | Implemented |
MS0233 # 02 Y:2003 | 02 | 2003 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $67,762 | $79,500 | Not Implemented |
MS0233 # 03 Y:2003 | 03 | 2003 | OPTIMIZE PLANT POWER FACTOR | $19,274 | $21,420 | Implemented |