Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,394
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0304 # 01 Y:2004 | 01 | 2004 | BURN A LESS EXPENSIVE GRADE OF FUEL | $83,144 | $1,360 | Not Implemented |
WV0304 # 02 Y:2004 | 02 | 2004 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $10,964 | $2,752 | Implemented |
WV0304 # 03 Y:2004 | 03 | 2004 | DEVELOP A REPAIR/REPLACE POLICY | $11,373 | $220 | Not Implemented |
WV0304 # 04 Y:2004 | 04 | 2004 | INSULATE BARE EQUIPMENT | $5,483 | $4,491 | Implemented |
WV0304 # 05 Y:2004 | 05 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,051 | $210 | Implemented |
WV0304 # 06 Y:2004 | 06 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,679 | $22 | Implemented |
WV0304 # 07 Y:2004 | 07 | 2004 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $1,535 | $44 | Not Implemented |
WV0304 # 08 Y:2004 | 08 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,376 | $0 | Implemented |
WV0304 # 09 Y:2004 | 09 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,328 | $271 | Not Implemented |
WV0304 # 10 Y:2004 | 10 | 2004 | INSULATE BARE EQUIPMENT | $509 | $44 | Implemented |
WV0304 # 11 Y:2004 | 11 | 2004 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $418 | $154 | Implemented |
UU0068 # 01 Y:2004 | 01 | 2004 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $21,193 | $325 | Implemented |
UU0068 # 02 Y:2004 | 02 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $8,711 | $3,315 | Not Implemented |
UU0068 # 03 Y:2004 | 03 | 2004 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $5,381 | $7,500 | Not Implemented |
UU0068 # 04 Y:2004 | 04 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,006 | $8,929 | Not Implemented |
UU0068 # 05 Y:2004 | 05 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,004 | $244 | Implemented |
UU0068 # 06 Y:2004 | 06 | 2004 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $12,376 | $1,292 | Implemented |
OR0462 # 01 Y:2004 | 01 | 2004 | REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL | $520,020 | $178,400 | Implemented |
OR0462 # 02 Y:2004 | 02 | 2004 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $1,600 | $300 | Not Implemented |
OR0462 # 03 Y:2004 | 03 | 2004 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,109 | $1,500 | Implemented |
OR0463 # 01 Y:2004 | 01 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,060 | $3,000 | Implemented |
OR0463 # 02 Y:2004 | 02 | 2004 | UPGRADE CONTROLS ON COMPRESSORS | $3,700 | $0 | Implemented |
OR0463 # 03 Y:2004 | 03 | 2004 | INSTALL / REPAIR INSULATION ON STEAM LINES | $26,000 | $22,920 | Not Implemented |
OR0463 # 04 Y:2004 | 04 | 2004 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $7,000 | $10,000 | Implemented |
OR0463 # 05 Y:2004 | 05 | 2004 | ADJUST BURNERS FOR EFFICIENT OPERATION | $73,800 | $600 | Implemented |