IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,260

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0007 # 09 Y:2007 09 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,816 $1,400 Not Implemented
UA0007 # 10 Y:2007 10 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,456 $0 Not Implemented
UA0007 # 11 Y:2007 11 2007 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $2,335 $7,017 Not Implemented
UA0007 # 12 Y:2007 12 2007 RECOVER WASTE HEAT FROM EQUIPMENT $1,979 $1,979 Not Implemented
UA0007 # 13 Y:2007 13 2007 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $717 $1,940 Not Implemented
UA0007 # 14 Y:2007 14 2007 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $768 $0 Not Implemented
UA0007 # 15 Y:2007 15 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,267 $250 Not Implemented
CO0603 # 01 Y:2007 01 2007 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $996,440 $366,170 Not Implemented
CO0603 # 02 Y:2007 02 2007 IMPROVE COMBUSTION CONTROL CAPABILITY $121,430 $100,000 Not Implemented
CO0603 # 03 Y:2007 03 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $31,750 $71,440 Implemented
CO0603 # 04 Y:2007 04 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,160 $90 Not Implemented
MZ0009 # 01 Y:2007 01 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,272 $0 Implemented
MZ0009 # 02 Y:2007 02 2007 INSTALL OCCUPANCY SENSORS $3,576 $2,450 Implemented
MZ0009 # 03 Y:2007 03 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,922 $1,150 Implemented
MZ0009 # 04 Y:2007 04 2007 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,310 $0 Implemented
MZ0009 # 05 Y:2007 05 2007 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $13,927 $2,500 Implemented
LE0260 # 01 Y:2007 01 2007 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $67,607 $74,000 Not Implemented
LE0260 # 02 Y:2007 02 2007 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $11,871 $60 Not Implemented
LE0260 # 03 Y:2007 03 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,263 $1,000 Not Implemented
LE0260 # 04 Y:2007 04 2007 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,657 $8,000 Not Implemented
LE0260 # 05 Y:2007 05 2007 INSTALL OCCUPANCY SENSORS $3,696 $1,350 Not Implemented
LE0260 # 06 Y:2007 06 2007 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $2,799 $2,500 Not Implemented
LE0260 # 07 Y:2007 07 2007 MINIMIZE WATER USAGE $1,524 $1,000 Not Implemented
LE0260 # 08 Y:2007 08 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $816 $200 Not Implemented
LE0260 # 09 Y:2007 09 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $234 $500 Not Implemented