IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,302

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0379 # 01 Y:2008 01 2008 ADJUST BURNERS FOR EFFICIENT OPERATION $871 $800 Implemented
NC0379 # 02 Y:2008 02 2008 LOWER OPERATING PRESSURE OF CONDENSER (STEAM) $333 $100 Implemented
NC0379 # 03 Y:2008 03 2008 REDUCE VENTILATION AIR $7,706 $25,500 Not Implemented
NC0379 # 04 Y:2008 04 2008 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $2,284 $3,000 Implemented
NC0379 # 05 Y:2008 05 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $237 $50 Implemented
NC0379 # 06 Y:2008 06 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $269 $100 Implemented
NC0379 # 07 Y:2008 07 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $101 $308 Implemented
NC0379 # 08 Y:2008 08 2008 DEVELOP A REPAIR/REPLACE POLICY $834 $1,728 Implemented
GT0852 # 01 Y:2008 01 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $24,327 $3,500 Implemented
GT0852 # 02 Y:2008 02 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,774 $0 Implemented
GT0852 # 03 Y:2008 03 2008 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $9,073 $9,000 Not Implemented
GT0852 # 04 Y:2008 04 2008 RECOVER WASTE HEAT FROM EQUIPMENT $790 $2,775 Not Implemented
GT0852 # 05 Y:2008 05 2008 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $9,500 $15,600 Not Implemented
GT0852 # 06 Y:2008 06 2008 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $22,600 $60,000 Not Implemented
GT0852 # 07 Y:2008 07 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,667 $37,500 Implemented
GT0852 # 08 Y:2008 08 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $31,037 $64,132 Not Implemented
LE0274 # 01 Y:2008 01 2008 INSTALL TIMERS AND/OR THERMOSTATS $18,751 $1,800 Not Implemented
LE0274 # 02 Y:2008 02 2008 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $13,058 $10,000 Not Implemented
LE0274 # 03 Y:2008 03 2008 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $6,438 $7,000 Not Implemented
LE0274 # 04 Y:2008 04 2008 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $2,421 $4,680 Implemented
LE0274 # 05 Y:2008 05 2008 USE SYNTHETIC LUBRICANT $1,064 $500 Implemented
LE0274 # 06 Y:2008 06 2008 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $189 $280 Implemented
LE0274 # 07 Y:2008 07 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,227 $18,236 Not Implemented
LE0274 # 08 Y:2008 08 2008 INSTALL OCCUPANCY SENSORS $1,642 $360 Not Implemented
UW0021 # 01 Y:2008 01 2008 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $52,486 $175,000 Not Implemented