IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,703

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0385 # 08 Y:2014 08 2014 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,231 $4,000 Not Implemented
LE0385 # 09 Y:2014 09 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,496 $12,000 Implemented
LE0385 # 10 Y:2014 10 2014 INSTALL OCCUPANCY SENSORS $10,832 $25,185 Implemented
LE0385 # 11 Y:2014 11 2014 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $4,728 $11,400 Not Implemented
UD0909 # 01 Y:2014 01 2014 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $20,106 $510 Not Implemented
UD0909 # 02 Y:2014 02 2014 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,680 $1,125 Implemented
UD0909 # 03 Y:2014 03 2014 INSTALL OCCUPANCY SENSORS $16,710 $4,000 Not Implemented
UD0909 # 04 Y:2014 04 2014 INSTALL SPECTRAL REFLECTORS / DELAMP $759 $500 Not Implemented
UD0909 # 05 Y:2014 05 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $667 $2,940 Implemented
UD0909 # 06 Y:2014 06 2014 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $11,214 $5,000 Implemented
UD0909 # 07 Y:2014 07 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,032 $1,000 Implemented
UD0909 # 08 Y:2014 08 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,327 $3,000 Not Implemented
UD0909 # 09 Y:2014 09 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $797 $0 Implemented
UD0909 # 10 Y:2014 10 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $797 $0 Implemented
UD0909 # 11 Y:2014 11 2014 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $7,664 $8,319 Not Implemented
UD0909 # 12 Y:2014 12 2014 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $5,987 $17,000 Not Implemented
WM0051 # 01 Y:2014 01 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $46,648 $27,260 Implemented
WM0051 # 02 Y:2014 02 2014 INSTALL OCCUPANCY SENSORS $15,358 $6,250 Not Implemented
WM0051 # 03 Y:2014 03 2014 INSULATE BARE EQUIPMENT $2,736 $800 Not Implemented
WM0051 # 04 Y:2014 04 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,050 $225 Implemented
WM0051 # 05 Y:2014 05 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,680 $3,200 Not Implemented
WM0051 # 06 Y:2014 06 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $18,680 $5,175 Not Implemented
WM0051 # 07 Y:2014 07 2014 PREHEAT COMBUSTION AIR WITH WASTE HEAT $9,345 $35,000 Not Implemented
WM0051 # 08 Y:2014 08 2014 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $14,378 $3,000 Not Implemented
WM0051 # 09 Y:2014 09 2014 REPLACE BOILER $11,306 $16,000 Implemented