IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,295

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0247 # 05 Y:2021 05 2021 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,246 $207 Not Implemented
IC0247 # 06 Y:2021 06 2021 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $283 $578 Not Implemented
IC0247 # 07 Y:2021 07 2021 RECOVER WASTE HEAT FROM EQUIPMENT $2,269 $24,850 Not Implemented
BS0149 # 01 Y:2021 01 2021 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE $9,819 $23 Not Implemented
BS0149 # 02 Y:2021 02 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $7,317 $313 Not Implemented
BS0149 # 03 Y:2021 03 2021 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $23,678 $1,000 Not Implemented
BS0149 # 04 Y:2021 04 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,150 $13,435 Not Implemented
BS0149 # 05 Y:2021 05 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $19,525 $50 Not Implemented
BS0148 # 01 Y:2021 01 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $39,220 $24,000 Not Implemented
BS0148 # 02 Y:2021 02 2021 RECOVER WASTE HEAT FROM EQUIPMENT $11,112 $50,404 Not Implemented
BS0148 # 03 Y:2021 03 2021 INSTALL / REPAIR INSULATION ON STEAM LINES $445 $649 Not Implemented
BS0148 # 04 Y:2021 04 2021 INSTALL OCCUPANCY SENSORS $1,298 $600 Not Implemented
MA0826 # 01 Y:2021 01 2021 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS $27,883 $250,000 Not Implemented
MA0826 # 02 Y:2021 02 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,639 $14,650 Not Implemented
MA0826 # 03 Y:2021 03 2021 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $2,447 $10,800 Not Implemented
MA0826 # 04 Y:2021 04 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $979 $1,631 Implemented
MA0826 # 05 Y:2021 05 2021 TURN OFF EQUIPMENT WHEN NOT IN USE $552 $250 Not Implemented
MA0826 # 06 Y:2021 06 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $551 $1,450 Implemented
MA0826 # 07 Y:2021 07 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $323 $625 Not Implemented
NC0664 # 01 Y:2021 01 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,718 $4,219 n/a
NC0664 # 02 Y:2021 02 2021 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $16,598 $1,000 n/a
NC0664 # 03 Y:2021 03 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $75 $300 n/a
NC0664 # 04 Y:2021 04 2021 INSTALL OCCUPANCY SENSORS $87 $300 n/a
NL0056 # 01 Y:2021 01 2021 OPERATE DISTILLATION COLUMNS EFFICIENTLY $222,300 $82,500 Implemented
NL0056 # 02 Y:2021 02 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,032 $1,600 Implemented