Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,982
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0234 # 01 Y:2023 | 01 | 2023 | ISOLATE HOT OR COLD EQUIPMENT | $6,940 | $1,552 | Implemented |
UU0234 # 02 Y:2023 | 02 | 2023 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $6,263 | $1,210 | Implemented |
UU0234 # 03 Y:2023 | 03 | 2023 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $90 | $400 | Implemented |
UU0234 # 04 Y:2023 | 04 | 2023 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $63 | $305 | Not Implemented |
UW2311 # 01 Y:2023 | 01 | 2023 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $6,427 | $15,722 | Implemented |
UW2311 # 02 Y:2023 | 02 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $26,668 | $83,148 | Implemented |
UW2311 # 03 Y:2023 | 03 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $470 | $2,080 | Implemented |
UW2311 # 04 Y:2023 | 04 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $112,574 | $693,588 | Implemented |
UW2311 # 05 Y:2023 | 05 | 2023 | OPTIMIZE PLANT POWER FACTOR | $11,250 | $49,905 | Implemented |
IP0177 # 01 Y:2023 | 01 | 2023 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $431 | $0 | Not Implemented |
IP0177 # 02 Y:2023 | 02 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $22,732 | $210 | Not Implemented |
IP0177 # 03 Y:2023 | 03 | 2023 | USE OPTIMUM TEMPERATURE | $10,080 | $0 | Not Implemented |
IP0177 # 04 Y:2023 | 04 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,379 | $0 | Not Implemented |
IP0177 # 05 Y:2023 | 05 | 2023 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,187 | $0 | Not Implemented |
IP0177 # 06 Y:2023 | 06 | 2023 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $91,806 | $8,000 | Not Implemented |
IP0177 # 07 Y:2023 | 07 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $5,815 | $653 | Not Implemented |
IP0177 # 08 Y:2023 | 08 | 2023 | INSTALL OCCUPANCY SENSORS | $1,228 | $764 | Not Implemented |
IP0177 # 09 Y:2023 | 09 | 2023 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $2,101 | $1,200 | Not Implemented |
IP0177 # 10 Y:2023 | 10 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $4,349 | $3,260 | Not Implemented |
IP0177 # 11 Y:2023 | 11 | 2023 | INSTALL REDUNDANT EQUIPMENT TO AVOID LOSSES CAUSED BY EQUIPMENT FAILURE AND ROUTINE MAINTENANCE | $409,614 | $304,570 | Not Implemented |
IP0177 # 12 Y:2023 | 12 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,714 | $17,391 | Not Implemented |
OR0776 # 01 Y:2023 | 01 | 2023 | OPTIMIZE PLANT POWER FACTOR | $1,131 | $6,802 | Implemented |
OR0776 # 02 Y:2023 | 02 | 2023 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $3,031 | $18,336 | Not Implemented |
OR0776 # 03 Y:2023 | 03 | 2023 | UPGRADE CONTROLS ON COMPRESSORS | $41,797 | $5,903 | Not Implemented |
MUWT04 # 01 Y:2023 | 01 | 2023 | USE STEAM PRESSURE REDUCTION TO GENERATE POWER | $7,630 | $31,680 | Not Implemented |