IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

143,514

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MO0107 # 07 Y:1994 07 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $277 $728 Implemented
MO0107 # 08 Y:1994 08 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,508 $12,224 Not Implemented
MO0107 # 09 Y:1994 09 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,301 $775 Implemented
MO0107 # 10 Y:1994 10 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,211 $3,010 Implemented
MO0107 # 11 Y:1994 11 1994 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,088 $250 Not Implemented
MO0107 # 12 Y:1994 12 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,162 $1,547 Implemented
MO0107 # 13 Y:1994 13 1994 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $460 $40 Implemented
AM0199 # 01 Y:1994 01 1994 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $16,380 $3,700 Implemented
AM0199 # 02 Y:1994 02 1994 USE SYNTHETIC LUBRICANT $1,590 $0 Not Implemented
AM0199 # 03 Y:1994 03 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,190 $1,874 Implemented
AM0199 # 04 Y:1994 04 1994 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,410 $70 Implemented
AM0199 # 05 Y:1994 05 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,570 $2,055 Implemented
AM0199 # 06 Y:1994 06 1994 USE SYNTHETIC LUBRICANT $670 $0 Not Implemented
AM0199 # 07 Y:1994 07 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $470 $730 Not Implemented
AM0200 # 01 Y:1994 01 1994 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $17,100 $17,000 Not Implemented
AM0200 # 02 Y:1994 02 1994 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $12,040 $17,000 Not Implemented
AM0200 # 03 Y:1994 03 1994 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $3,950 $2,550 Not Implemented
AM0200 # 04 Y:1994 04 1994 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $1,380 $710 Not Implemented
AM0200 # 05 Y:1994 05 1994 MINIMIZE WATER USAGE $1,250 $100 Implemented
AM0200 # 06 Y:1994 06 1994 USE SYNTHETIC LUBRICANT $480 $0 Not Implemented
AM0200 # 07 Y:1994 07 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $340 $460 Not Implemented
AM0200 # 08 Y:1994 08 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $440 $100 Implemented
AM0201 # 01 Y:1994 01 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $37,480 $3,520 Implemented
AM0201 # 02 Y:1994 02 1994 OPTIMIZE PLANT POWER FACTOR $18,700 $26,650 Not Implemented
AM0201 # 03 Y:1994 03 1994 PAY UTILITY BILLS ON TIME $1,915 $0 Implemented