IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,708

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0297 # 02 Y:2002 02 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $705 $169 Not Implemented
IA0297 # 03 Y:2002 03 2002 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $12,209 $8,444 Not Implemented
IA0297 # 04 Y:2002 04 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,300 $237 Implemented
IA0297 # 05 Y:2002 05 2002 INSTALL OCCUPANCY SENSORS $104 $333 Not Implemented
IA0297 # 06 Y:2002 06 2002 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $32,300 $15,336 Not Implemented
LE0142 # 01 Y:2002 01 2002 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $20,390 $42,000 Not Implemented
LE0142 # 02 Y:2002 02 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $18,173 $10,000 Not Implemented
LE0142 # 03 Y:2002 03 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,631 $1,500 Implemented
LE0142 # 04 Y:2002 04 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,077 $1,920 Not Implemented
LE0142 # 05 Y:2002 05 2002 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $12,299 $750 Implemented
LE0142 # 06 Y:2002 06 2002 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $8,033 $16,000 Not Implemented
LE0142 # 07 Y:2002 07 2002 USE SYNTHETIC LUBRICANT $4,719 $400 Implemented
LE0142 # 08 Y:2002 08 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,628 $0 Not Implemented
CO0509 # 01 Y:2002 01 2002 USE DEMAND CONTROLLER OR LOAD SHEDDER $2,920 $8,000 Not Implemented
CO0509 # 02 Y:2002 02 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,620 $230 Implemented
CO0509 # 03 Y:2002 03 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $640 $2,260 Not Implemented
CO0509 # 04 Y:2002 04 2002 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $610 $1,920 Not Implemented
CO0509 # 05 Y:2002 05 2002 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $17,700 $2,000 Implemented
CO0509 # 06 Y:2002 06 2002 INCREASE USE OF AUTOMATION $9,140 $1,600 Implemented
CO0509 # 07 Y:2002 07 2002 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS $2,450 $1,330 Implemented
GT0739 # 01 Y:2002 01 2002 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $19,440 $122,500 Not Implemented
GT0739 # 02 Y:2002 02 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,592 $1,900 Implemented
GT0739 # 03 Y:2002 03 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,450 $50,177 Implemented
GT0739 # 04 Y:2002 04 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $186 $16,560 Not Implemented
GT0739 # 05 Y:2002 05 2002 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,700 $300 Implemented