IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,708

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0244 # 02 Y:2002 02 2002 INSTALL COMMON HEADER ON COMPRESSORS $10,649 $17,871 Not Implemented
NC0244 # 03 Y:2002 03 2002 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $7,280 $1,350 Not Implemented
NC0244 # 04 Y:2002 04 2002 RECOVER WASTE HEAT FROM EQUIPMENT $2,140 $2,000 Not Implemented
NC0244 # 05 Y:2002 05 2002 USE PHOTOCELL CONTROLS $167 $150 Implemented
NC0244 # 06 Y:2002 06 2002 USE SOLAR HEAT TO HEAT WATER $3,554 $8,775 Not Implemented
LE0142 # 01 Y:2002 01 2002 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $20,390 $42,000 Not Implemented
LE0142 # 02 Y:2002 02 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $18,173 $10,000 Not Implemented
LE0142 # 03 Y:2002 03 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,631 $1,500 Implemented
LE0142 # 04 Y:2002 04 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,077 $1,920 Not Implemented
LE0142 # 05 Y:2002 05 2002 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $12,299 $750 Implemented
LE0142 # 06 Y:2002 06 2002 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $8,033 $16,000 Not Implemented
LE0142 # 07 Y:2002 07 2002 USE SYNTHETIC LUBRICANT $4,719 $400 Implemented
LE0142 # 08 Y:2002 08 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,628 $0 Not Implemented
SD0304 # 01 Y:2002 01 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $258,459 $242,000 Not Implemented
SD0304 # 02 Y:2002 02 2002 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $362,272 $628,750 Not Implemented
SD0304 # 03 Y:2002 03 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $43,804 $29,000 Not Implemented
SD0304 # 04 Y:2002 04 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $32,788 $39,000 Not Implemented
SD0304 # 05 Y:2002 05 2002 USE PHOTOCELL CONTROLS $21,520 $3,000 Not Implemented
SD0304 # 06 Y:2002 06 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $13,050 $0 Not Implemented
SD0304 # 07 Y:2002 07 2002 INSULATE BARE EQUIPMENT $12,405 $2,120 Not Implemented
SD0304 # 08 Y:2002 08 2002 INSTALL OCCUPANCY SENSORS $2,591 $600 Not Implemented
SD0304 # 09 Y:2002 09 2002 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $10,400 $15,000 Not Implemented
SD0304 # 10 Y:2002 10 2002 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $5,500 $2,500 Not Implemented
CO0509 # 01 Y:2002 01 2002 USE DEMAND CONTROLLER OR LOAD SHEDDER $2,920 $8,000 Not Implemented
CO0509 # 02 Y:2002 02 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,620 $230 Implemented