Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,302
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UW0021 # 02 Y:2008 | 02 | 2008 | OPERATE BOILERS ON HIGH FIRE SETTING | $20,223 | $49,000 | Not Implemented |
UW0021 # 03 Y:2008 | 03 | 2008 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,357 | $5,912 | Not Implemented |
UW0021 # 04 Y:2008 | 04 | 2008 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $5,612 | $50,000 | Not Implemented |
UW0021 # 05 Y:2008 | 05 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,472 | $0 | Not Implemented |
UW0021 # 06 Y:2008 | 06 | 2008 | INSTALL OCCUPANCY SENSORS | $478 | $450 | Not Implemented |
SU0268 # 01 Y:2008 | 01 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $15,465 | $0 | Not Implemented |
SU0268 # 02 Y:2008 | 02 | 2008 | PAY BILLS ON TIME TO AVOID LATE FEES | $854 | $0 | Not Implemented |
SU0268 # 03 Y:2008 | 03 | 2008 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $22,823 | $1,071 | Implemented |
SU0268 # 04 Y:2008 | 04 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,511 | $1,250 | Implemented |
SU0268 # 05 Y:2008 | 05 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $310 | $385 | Implemented |
SU0268 # 06 Y:2008 | 06 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $39,769 | $83,044 | Implemented |
SU0268 # 07 Y:2008 | 07 | 2008 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $781 | $1,451 | Not Implemented |
SU0268 # 08 Y:2008 | 08 | 2008 | INSTALL OCCUPANCY SENSORS | $318 | $674 | Implemented |
SU0268 # 09 Y:2008 | 09 | 2008 | OPTIMIZE PLANT POWER FACTOR | $11,006 | $39,533 | Not Implemented |
DL0014 # 01 Y:2008 | 01 | 2008 | TURN OFF EQUIPMENT WHEN NOT IN USE | $3,600 | $0 | Implemented |
DL0014 # 02 Y:2008 | 02 | 2008 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $470 | $635 | Not Implemented |
DL0014 # 03 Y:2008 | 03 | 2008 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,173 | $4,200 | Not Implemented |
DL0014 # 04 Y:2008 | 04 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,481 | $12,133 | Not Implemented |
DL0014 # 05 Y:2008 | 05 | 2008 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,500 | $15,000 | Not Implemented |
DL0014 # 06 Y:2008 | 06 | 2008 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $4,200 | $20,000 | Not Implemented |
NC0378 # 01 Y:2008 | 01 | 2008 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $97,991 | $50,000 | Implemented |
NC0378 # 02 Y:2008 | 02 | 2008 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $56,045 | $85,000 | Not Implemented |
NC0378 # 03 Y:2008 | 03 | 2008 | TURN OFF EQUIPMENT WHEN NOT IN USE | $3,480 | $500 | Not Implemented |
NC0378 # 04 Y:2008 | 04 | 2008 | REVISE SMOKE CLEANUP FROM OPERATIONS | $2,215 | $7,700 | Not Implemented |
NC0378 # 05 Y:2008 | 05 | 2008 | RECOVER WASTE HEAT FROM EQUIPMENT | $17,355 | $7,450 | Not Implemented |